Skip to main content

Safer roads

The first SAB-Gate supplied by Highway Care to the UK is now in use. The Balfour Beatty Mott MacDonald (BBMM) partnership installed the SAB-Gates at two strategic locations along the M4 and M5 highways, with approval from the UK's Highways Agency. The units, which are manufactured in Italy by Snoline, are now in place in the central reservation at Emergency Crossing Points. On a number of sites, BBMM is replacing the existing central reserve steel barrier with concrete step barrier (CSB) and this will requi
February 6, 2012 Read time: 2 mins
The first SAB-Gate supplied by 1529 Highway Care to the UK is now in use. The 1530 Balfour Beatty Mott MacDonald (BBMM) partnership installed the SAB-Gates at two strategic locations along the M4 and M5 highways, with approval from the UK's Highways Agency. The units, which are manufactured in Italy by 333 Snoline, are now in place in the central reservation at Emergency Crossing Points. On a number of sites, BBMM is replacing the existing central reserve steel barrier with concrete step barrier (CSB) and this will require Emergency Crossing Points that incorporate removable sections or gates. The SAB-Gate is a modular H2 containment gate system, which is transitioned on to the CSB. It can be easily opened by one person without the use of any special tools or the removal of any fixings. The 4.3m SAB-Gate modules can be opened either by individual sections, as a whole, or part gate from hinge positions at either end.

For more information on companies in this article

Related Content

  • Innovative formwork solution to bridge construction
    February 20, 2012
    Innovative solutions are being applied to the construction of bridge structures as Patrick Smith reports. RMD Kwikform Iberica has engineered and supplied specialist formwork and falsework for construction of the much-needed Monteporreiro Viaduct in northern Spain. The viaduct will connect Monteporreiro with the Benedictine Monastery of San Bieito Lérez on the other side of the river, and in the process will ease congestion in the nearby town of Pontevedra, diverting some 5,000 vehicles/day.
  • Lindsay argues the case for reversible lanes over adding lanes
    June 26, 2018
    Build new lanes or use existing lanes more effectively? In a recent US study* commissioned by Lindsay Transportation Solutions, the company argues the case for reversible lanes. The level of future uncertainty in transportation planning - specifically in addressing congestion on urban freeways - has increased significantly over the past few years. The impact of connected and autonomous vehicles on traffic flow, of Mobility as a Service (MaaS) initiatives, particularly the car-sharing elements, and exciting
  • BOMAG Advanced Pave, the digital co-pilot
    May 1, 2021
    BOMAG introduces its new generation of Universal and Highway class pavers
  • Seal of approval for Sika
    June 22, 2012
    Skikaflex Construction by UK-based Sika was chosen by Skanska Balfour Beatty Joint Venture to seal movement joints during the widening of one of Europe’s busiest motorways. The M25, also known as the London Orbital, handles around 200,000 vehicles every day on its busiest sections. Its widening between junctions 27 and 30 is said to be delivering much needed extra capacity to tackle congestion and improve journey times.