Skip to main content

Safer roads

The first SAB-Gate supplied by Highway Care to the UK is now in use. The Balfour Beatty Mott MacDonald (BBMM) partnership installed the SAB-Gates at two strategic locations along the M4 and M5 highways, with approval from the UK's Highways Agency. The units, which are manufactured in Italy by Snoline, are now in place in the central reservation at Emergency Crossing Points. On a number of sites, BBMM is replacing the existing central reserve steel barrier with concrete step barrier (CSB) and this will requi
February 6, 2012 Read time: 2 mins
The first SAB-Gate supplied by 1529 Highway Care to the UK is now in use. The 1530 Balfour Beatty Mott MacDonald (BBMM) partnership installed the SAB-Gates at two strategic locations along the M4 and M5 highways, with approval from the UK's Highways Agency. The units, which are manufactured in Italy by 333 Snoline, are now in place in the central reservation at Emergency Crossing Points. On a number of sites, BBMM is replacing the existing central reserve steel barrier with concrete step barrier (CSB) and this will require Emergency Crossing Points that incorporate removable sections or gates. The SAB-Gate is a modular H2 containment gate system, which is transitioned on to the CSB. It can be easily opened by one person without the use of any special tools or the removal of any fixings. The 4.3m SAB-Gate modules can be opened either by individual sections, as a whole, or part gate from hinge positions at either end.

For more information on companies in this article

Related Content

  • Superlative formwork’s global appeal
    April 25, 2013
    The latest formwork solutions are enabling some tough bridge-building projects to be delivered in South America and Europe, while the world’s largest construction equipment show is seeing the merits of other cutting-edge formwork. Guy Woodford reports. Taking a road and rail link across one of South America’s largest rivers, together with its swamps and floodplain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shap
  • First stay cable installed on UK’s Mersey Gateway bridge
    October 31, 2016
    The first stay cable, 52m long, connecting the Mersey Gateway south pylon to the main bridge deck, has been installed on the Mersey Gateway Project.
  • Controlling influence
    January 3, 2013
    New lane control solutions from major roadmarking companies have been installed on highways across the world over recent months. Guy Woodford reports on some of them. Clearview Traffic Group (CTG) recently clocked up the installation of over 70,000 Astucia active flush and surface mounted road studs in the UK. CTG has been involved in numerous road stud installation projects on motorways and other road types in the UK and many other countries worldwide. Its UK installations include over 4,500 Astucia road s
  • Aggregate Industries launches Foamix Eco
    March 4, 2024
    Aggregate Industries developed the new Eco product in partnership with Nynas, a biogenic bitumen supplier, and OCO Technology, a carbon-capture specialist.