Skip to main content

Safer roads

The first SAB-Gate supplied by Highway Care to the UK is now in use. The Balfour Beatty Mott MacDonald (BBMM) partnership installed the SAB-Gates at two strategic locations along the M4 and M5 highways, with approval from the UK's Highways Agency. The units, which are manufactured in Italy by Snoline, are now in place in the central reservation at Emergency Crossing Points. On a number of sites, BBMM is replacing the existing central reserve steel barrier with concrete step barrier (CSB) and this will requi
February 6, 2012 Read time: 2 mins
The first SAB-Gate supplied by 1529 Highway Care to the UK is now in use. The 1530 Balfour Beatty Mott MacDonald (BBMM) partnership installed the SAB-Gates at two strategic locations along the M4 and M5 highways, with approval from the UK's Highways Agency. The units, which are manufactured in Italy by 333 Snoline, are now in place in the central reservation at Emergency Crossing Points. On a number of sites, BBMM is replacing the existing central reserve steel barrier with concrete step barrier (CSB) and this will require Emergency Crossing Points that incorporate removable sections or gates. The SAB-Gate is a modular H2 containment gate system, which is transitioned on to the CSB. It can be easily opened by one person without the use of any special tools or the removal of any fixings. The 4.3m SAB-Gate modules can be opened either by individual sections, as a whole, or part gate from hinge positions at either end.

For more information on companies in this article

Related Content

  • Asphalt paving advances for global markets
    October 27, 2022
    New asphalt paver designs for global markets are now being made available
  • Refurbishing Heathrow road tunnel
    December 11, 2015
    A Positioner-Actuator-Manipulator (PAM)machine on hire from UK dealer STM of Tring has been able to cut concrete removal time for Bam Nuttall on its €116.2 million tunnel refurbishment contract at Heathrow Airport. The 18-month contract involves major work on the main and cargo tunnels serving Terminals 1, 2 and 3 in order to comply with the latest European standards and also to extend the life of the tunnels for a further 60 years. As part of the project, some 206m2 of concrete repairs were needed to be
  • Cold road reclamation in South Africa
    July 18, 2012
    Raubex Construction’s new Cat RM500 rotary mixer is proving its worth on a road reclamation work on a South African highway Part of an extensive motorway network some 185km long, South Africa’s ongoing Gauteng Freeway Improvement Project (GIFP) is creating a modern, world-class toll route system. The new road will provide major impetus to socio-economic growth in the country’s most populous and commercially active region. Being built in stages by the South African National Roads Authority (SANRAL), these r
  • Cifa gets pumped over final work on Milan bypass
    May 14, 2015
    Truck-mounted concrete pumps from the manufacturer Cifa have been working around the clock at one of Italy’s most prestigious road infrastructure projects, the Milan Outer Bypass. The toll motorway project, known by the TEEM acronym from the Italian name Tangenziale Est Esterna di Milano, involves 32km of new carriageway consisting of three lanes in each direction in addition to an emergency lane. The route winds through agricultural land and connects the A4 highway (Milano-Venezia) in the north to the A