Skip to main content

Safer with REBLOC 185A barriers

REBLOC says that its 185A barrier is the world’s first safety barrier to have the highest containment levels of H4a and H4b with the unmatched vehicle intrusion rating of VI2.
March 8, 2022 Read time: 2 mins
The anchored REBLOC 185A precast concrete barrier offers the best protection against errant vehicles

The impact of heavy goods vehicles with bridges – be it piers, overhead signs, suspension cables or other street furniture – continues to be a major issue for highway owners and local authorities. There is always the chance that damage to a bridge’s structure could at any time render it unsafe for further use until repairs are made.

The REBLOC 185A barrier is the world's first extensively tested and fully compliant EN 1317-1/2 standard safety barrier with the highest containment levels H4a and H4b. It has a working width of W1 and W2 and has an outstanding VI2 vehicle intrusion level. The barrier is 1.85m high x 0.57m wide and only requires a footprint of just 0.8m, making the system suitable for a vast array of bridge types.

The anchored barrier offers the best protection against errant vehicles; preventing the vehicle from breaking through or projecting over the barrier. Damage to the bride structure is limited and – importantly – driver and passenger safety is greatly enhanced.

Due to its modular design and a patented coupling system, the REBLOC 185A is quickly and effortlessly installed onsite irrespective of the season or weather conditions. Fast and efficient installation shortens the time of restrictive measures for traffic.

REBLOC is a specialist in precast concrete barriers, providing a wide range of road safety solutions for almost every permanent and temporary application on roads and bridges, including integrated noise protection, emergency gates and urban safety systems.

For more information on companies in this article

Related Content

  • Use 3D modelling to advance sustainable highway construction best practices
    April 30, 2025
    When it comes to advancing highway sustainability, the role of 3D modeling and digital technologies in road construction is becoming ever-more important. Anna Liza Montenegro, director of marketing at Microsol Resources explains why your business needs to get involved now.
  • Advances in tunneling machines coming to market
    November 19, 2015
    A diverse array of new tunnelling technologies will help boost productivity and cut project costs, while boosting quality - Mike Woof writes The worldwide market for tunnelling projects continues to be strong, with a series of major projects underway or planned for the future. These good market conditions have helped fuel research and development in new tunnelling equipment, designed to be more productive, more efficient and more reliable and able to deliver a higher quality of work. Drilling and blas
  • Terex cranes in a tight spot in Michigan
    February 6, 2017
    Terex cranes have been involved in a multiple bridge repair project in the US More than 96,000 vehicles per day travel a stretch of I-96, including its 52-year-old bridges. The Michigan Department of Transportation is in the midst of a two-year US$77 million project to repair bridges and relieve increasing congestion along Interstate 96 at the U.S. Highway 23 interchange in Livingston County. Toebe Construction along with joint venture partner Kamminga & Roodvoets are bringing in a lot of lifting powe
  • Bridge surface repair improves safety
    July 9, 2012
    Modern products are making life easier for those who have to look after bridges in need of repair Aproject to repair a bridge in the American state of Tennessee has brought safety benefits and improved the ride quality for drivers using the crossing. The Chickasaw Bridge spans the Ellington Parkway and it has benefited from a rehabilitation job by contractor Jamieson Construction. The roadway on the bridge was in a poor state and required frequent patching, and to tackle the problem, the Tennessee DOT consi