Skip to main content

Safer with REBLOC 185A barriers

REBLOC says that its 185A barrier is the world’s first safety barrier to have the highest containment levels of H4a and H4b with the unmatched vehicle intrusion rating of VI2.
March 8, 2022 Read time: 2 mins
The anchored REBLOC 185A precast concrete barrier offers the best protection against errant vehicles

The impact of heavy goods vehicles with bridges – be it piers, overhead signs, suspension cables or other street furniture – continues to be a major issue for highway owners and local authorities. There is always the chance that damage to a bridge’s structure could at any time render it unsafe for further use until repairs are made.

The REBLOC 185A barrier is the world's first extensively tested and fully compliant EN 1317-1/2 standard safety barrier with the highest containment levels H4a and H4b. It has a working width of W1 and W2 and has an outstanding VI2 vehicle intrusion level. The barrier is 1.85m high x 0.57m wide and only requires a footprint of just 0.8m, making the system suitable for a vast array of bridge types.

The anchored barrier offers the best protection against errant vehicles; preventing the vehicle from breaking through or projecting over the barrier. Damage to the bride structure is limited and – importantly – driver and passenger safety is greatly enhanced.

Due to its modular design and a patented coupling system, the REBLOC 185A is quickly and effortlessly installed onsite irrespective of the season or weather conditions. Fast and efficient installation shortens the time of restrictive measures for traffic.

REBLOC is a specialist in precast concrete barriers, providing a wide range of road safety solutions for almost every permanent and temporary application on roads and bridges, including integrated noise protection, emergency gates and urban safety systems.

For more information on companies in this article

Related Content

  • Certified safe: ARTBA president talks future highways and safety
    January 16, 2020
    What keeps Dave Bauer* up at night? David Arminas caught up with the head of ARTBA at his Washington D.C. office during daylight hours
  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o
  • SRL offers Sign Manager for traffic control
    June 8, 2022
    SRL will be showing SWARCO’s Sign Manager software at the upcoming Traffex exhibition near Birmingham in England, from June 14-16.
  • IRF recommends action for greener roads
    July 4, 2012
    IRF's 2nd International Conference on Roads and Environment reveals how to make roads greener, cleaner and healthier, and follows through with action recommendations IRF's Conference in Geneva on 10-11 November, 2008 put three issues in sharp focus: innovative materials to save energy and other resources, inspiring solutions for water management; an integrated approach to noise and air pollution; and greenhouse gas (GHG) emissions monitoring, accounting and offsetting. Some 140 delegates from 36 countries l