Skip to main content

Safer with REBLOC 185A barriers

REBLOC says that its 185A barrier is the world’s first safety barrier to have the highest containment levels of H4a and H4b with the unmatched vehicle intrusion rating of VI2.
March 8, 2022 Read time: 2 mins
The anchored REBLOC 185A precast concrete barrier offers the best protection against errant vehicles

The impact of heavy goods vehicles with bridges – be it piers, overhead signs, suspension cables or other street furniture – continues to be a major issue for highway owners and local authorities. There is always the chance that damage to a bridge’s structure could at any time render it unsafe for further use until repairs are made.

The REBLOC 185A barrier is the world's first extensively tested and fully compliant EN 1317-1/2 standard safety barrier with the highest containment levels H4a and H4b. It has a working width of W1 and W2 and has an outstanding VI2 vehicle intrusion level. The barrier is 1.85m high x 0.57m wide and only requires a footprint of just 0.8m, making the system suitable for a vast array of bridge types.

The anchored barrier offers the best protection against errant vehicles; preventing the vehicle from breaking through or projecting over the barrier. Damage to the bride structure is limited and – importantly – driver and passenger safety is greatly enhanced.

Due to its modular design and a patented coupling system, the REBLOC 185A is quickly and effortlessly installed onsite irrespective of the season or weather conditions. Fast and efficient installation shortens the time of restrictive measures for traffic.

REBLOC is a specialist in precast concrete barriers, providing a wide range of road safety solutions for almost every permanent and temporary application on roads and bridges, including integrated noise protection, emergency gates and urban safety systems.

For more information on companies in this article

Related Content

  • New excavator from Hitachi
    February 17, 2012
    Hitachi's new wheeled excavator offers the latest engine and advanced hydraulics. The short-tail ZX145W-3 suits applications in confined urban areas as well as on highway projects. The machine has been developed especially for European customers and features an integrated transmission and a reinforced structure.
  • Dubai infrastructure development
    March 24, 2017
    New infrastructure is being built in Dubai with the help of machines from Volvo CE The Dubai Water Canal is being built in a busy and congested urban area, with the project including construction of major new road bridge crossings. The work is being carried out by Turkish infrastructure specialist DETECH Contracting. The 3.2km waterway is being built through downtown Dubai and is among the most ambitious projects being carried out in the country. When fully opened in 2017 the project – called The Duba
  • Advances in road markings
    March 16, 2012
    Recent months have seen many major and vital road marking projects and products completed and tested in different parts of the world. Guy Woodford looks at some of them in Europe, North America, the Middle East and Africa. The London borough of Kensington and Chelsea now has one of the most dramatic streetscape designs in Europe. Exhibition Road’s striking chequered granite design, featuring a single surface running from South Kensington Station to Hyde Park and the full width of the road from building to b
  • Ma(r)king the roads readable for self-driving cars
    December 20, 2021
    CAV, V2X, C-ITS, CCAM – the acronyms are differing, but they all have in common that they denominate the linking of road infrastructure and vehicles with the aim to improve traffic flow, reduce emissions and make traffic safer and our journeys more convenient.