Skip to main content

Safer with REBLOC 185A barriers

REBLOC says that its 185A barrier is the world’s first safety barrier to have the highest containment levels of H4a and H4b with the unmatched vehicle intrusion rating of VI2.
March 8, 2022 Read time: 2 mins
The anchored REBLOC 185A precast concrete barrier offers the best protection against errant vehicles

The impact of heavy goods vehicles with bridges – be it piers, overhead signs, suspension cables or other street furniture – continues to be a major issue for highway owners and local authorities. There is always the chance that damage to a bridge’s structure could at any time render it unsafe for further use until repairs are made.

The REBLOC 185A barrier is the world's first extensively tested and fully compliant EN 1317-1/2 standard safety barrier with the highest containment levels H4a and H4b. It has a working width of W1 and W2 and has an outstanding VI2 vehicle intrusion level. The barrier is 1.85m high x 0.57m wide and only requires a footprint of just 0.8m, making the system suitable for a vast array of bridge types.

The anchored barrier offers the best protection against errant vehicles; preventing the vehicle from breaking through or projecting over the barrier. Damage to the bride structure is limited and – importantly – driver and passenger safety is greatly enhanced.

Due to its modular design and a patented coupling system, the REBLOC 185A is quickly and effortlessly installed onsite irrespective of the season or weather conditions. Fast and efficient installation shortens the time of restrictive measures for traffic.

REBLOC is a specialist in precast concrete barriers, providing a wide range of road safety solutions for almost every permanent and temporary application on roads and bridges, including integrated noise protection, emergency gates and urban safety systems.

For more information on companies in this article

Related Content

  • Improving the UK’s road markings efficiently
    June 30, 2014
    According to a recently published report, based on the findings of the Road Safety Markings Association (RSMA), the condition of road markings on the UK’s roads is so poor they require immediate remedial action. This comprehensive survey covered 7,000km of the roads in England, Wales, Scotland and Northern Ireland. It revealed that 47% of markings on all roads (and as much as 52% on motorways) in England are in need of immediate replacement or should be scheduled for replacement in order to ensure they meet
  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b
  • Reducing plant noise
    February 7, 2012
    German quarrying firm Oetelshofen Kalk has cut noise emissions by half and tripled machine service life, by installing dual hardness rubber liners in its crushing plant. Based in Wuppertal, the Oetelshofen quarry company produces 2 million tonnes of limestone products/year, and has a turnover of €35 million/year.