Skip to main content

Russian road repair

The driver of a construction truck in the Russian city of Voronezh recently had an unwelcome surprise when his own vehicle became the centre for a major road repair. The mixer truck was being driven along the road to a construction site when it suddenly fell into a large hole in the roadway. No ordinary pothole, this was sufficiently large for the rear of the vehicle to tumble inside, leaving only the cab poking out. The driver managed to jump out and was unhurt. The truck was less fortunate however as the
January 14, 2015 Read time: 2 mins
The driver of a construction truck in the Russian city of Voronezh recently had an unwelcome surprise when his own vehicle became the centre for a major road repair. The mixer truck was being driven along the road to a construction site when it suddenly fell into a large hole in the roadway. No ordinary pothole, this was sufficiently large for the rear of the vehicle to tumble inside, leaving only the cab poking out. The driver managed to jump out and was unhurt. The truck was less fortunate however as the mixer was stopped from rotating, which then allowed the concrete to set hard. It took two days for the truck to be removed from the massive hole in the roadway due to the difficulty of extracting the heavy vehicle, made worse by concerns that a further section of the roadway could collapse. The incident caused major traffic congestion in the city as well as calls for an investigation into as to why the road could have collapsed, considering that it had been repaired only shortly beforehand.

Related Content

  • Presidio Parkway: the Golden Gate Bridge’s new southern approach road
    May 29, 2013
    Work on the Presidio Parkway, a new breathtaking and eco-friendly southern approach road to San Francisco’s Golden Gate Bridge, has entered its crucial second and final phase. As Guy Woodford reports, the vital US$1 billion project has overcome legal as well as environmental challenges to stay on course for its expected 2016 completion Just after 9pm on Friday April 27, 2012 a large public crowd looked on excitedly as a fleet of more than 40 R&L Brosamer and Ferma Corporation deployed hydraulic demolition h
  • Airport runway rebuild at Bologna
    May 15, 2019
    Rebuilding a runway requires special attention to detail to maximise efficiency and safety Airport runways face special challenges with regard to the loads they carry on a daily basis, particularly when aircraft are landing. A modern jet aircraft will typically land at speeds of around 240-260km/h, with a laden 747 weighing as much as 265tonnes at the end of a long flight. The stresses these large aircraft place on runway surfaces are enormous and not just with the massive impact forces exerted during
  • Managing urban motorway complexity in Sydney
    October 4, 2012
    Sydney’s Hills M2 motorway is being widened while still carrying traffic and meeting tough environmental criteria More than 100,000 vehicles and over 27,000 bus commuters use the Hills M2 motorway on a typical workday, making it one of Sydney’s busiest motorway corridors. Owned and managed by Hills Motorway Ltd (HML) and a key part of the city’s orbital motorway network, the road stretches over 21km, providing a seamless link between the Lane Cove Tunnel and Westlink M7. The Hills M2 Upgrade is one of many
  • Wirtgen’s rapid road rehab
    April 30, 2024

    It’s a picturesque Sicilian landscape of small roads stretching up and down hills and around tight curves. But when these small roads need big renovations, it takes a large machine to do it fast and efficiently. This is why a contractor chose the W 210 Fi large milling machine which can mill up the entire roadway in two-to-three passes.