Skip to main content

Russian road repair

The driver of a construction truck in the Russian city of Voronezh recently had an unwelcome surprise when his own vehicle became the centre for a major road repair. The mixer truck was being driven along the road to a construction site when it suddenly fell into a large hole in the roadway. No ordinary pothole, this was sufficiently large for the rear of the vehicle to tumble inside, leaving only the cab poking out. The driver managed to jump out and was unhurt. The truck was less fortunate however as the
January 14, 2015 Read time: 2 mins
The driver of a construction truck in the Russian city of Voronezh recently had an unwelcome surprise when his own vehicle became the centre for a major road repair. The mixer truck was being driven along the road to a construction site when it suddenly fell into a large hole in the roadway. No ordinary pothole, this was sufficiently large for the rear of the vehicle to tumble inside, leaving only the cab poking out. The driver managed to jump out and was unhurt. The truck was less fortunate however as the mixer was stopped from rotating, which then allowed the concrete to set hard. It took two days for the truck to be removed from the massive hole in the roadway due to the difficulty of extracting the heavy vehicle, made worse by concerns that a further section of the roadway could collapse. The incident caused major traffic congestion in the city as well as calls for an investigation into as to why the road could have collapsed, considering that it had been repaired only shortly beforehand.

Related Content

  • WASH AND GO
    February 9, 2018
    Our Skidmarks page is highly rated by readers. Your input could help make this page even more entertaining. If you come across any amusing road-related stories or pictures email me at [email protected]
  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v
  • Busy bridge in Beijing replaced quickly
    March 31, 2016
    The replacement of a very busy road bridge in China’s capital Beijing has been carried out successfully. Due to the volume of traffic using the bridge during week days, the work had to be carried out quickly so as to minimise traffic disruption. But despite being carried out in the centre of Beijing, the replacement work for the Sanyuan Bridge just took 43 hours from start to completion.
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.