Skip to main content

Russian road repair

The driver of a construction truck in the Russian city of Voronezh recently had an unwelcome surprise when his own vehicle became the centre for a major road repair. The mixer truck was being driven along the road to a construction site when it suddenly fell into a large hole in the roadway. No ordinary pothole, this was sufficiently large for the rear of the vehicle to tumble inside, leaving only the cab poking out. The driver managed to jump out and was unhurt. The truck was less fortunate however as the
January 14, 2015 Read time: 2 mins
The driver of a construction truck in the Russian city of Voronezh recently had an unwelcome surprise when his own vehicle became the centre for a major road repair. The mixer truck was being driven along the road to a construction site when it suddenly fell into a large hole in the roadway. No ordinary pothole, this was sufficiently large for the rear of the vehicle to tumble inside, leaving only the cab poking out. The driver managed to jump out and was unhurt. The truck was less fortunate however as the mixer was stopped from rotating, which then allowed the concrete to set hard. It took two days for the truck to be removed from the massive hole in the roadway due to the difficulty of extracting the heavy vehicle, made worse by concerns that a further section of the roadway could collapse. The incident caused major traffic congestion in the city as well as calls for an investigation into as to why the road could have collapsed, considering that it had been repaired only shortly beforehand.

Related Content

  • Bridging the gap in African infrastructure
    December 20, 2013
    Leading formwork manufacturers have secured some impressive contracts in Africa, as the continent’s transport infrastructure continues to improve at a rapid pace. Meanwhile, other bridgework equipment companies are also seeing their products in demand in Africa, as well as North America and Australia.
  • Caterpillar Paving offers a guide to efficient night time paving practices
    October 3, 2014
    Efficient night-time paving operations can reduce construction costs and cut traffic delays - *Todd Mansell writes As roads become more congested, the user cost of daytime lane closures to accommodate road construction and paving has increased dramatically. One solution to lower user costs associated with traffic delays is to carry out more paving at night during off-peak times. However night-time paving brings new challenges to producing quality work in safely.
  • Brazil roads repaired with Wirtgen equipment
    November 6, 2018
    A large milling machine from Wirtgen has been used to help repair busy roads in the vicinity of São Paulo in Brazil. The roads provide important transport connections as they link São Paulo with Santos, Brazil’s largest port. The Anchieta-Imigrantes highway system provides the main link between the metropolitan region of São Paulo and the port of Santos, the busiest port in Latin America. Construction of the Anchieta highway began in 1947, with Imigrantes following at the start of the 1970s. Today the Anch
  • Out of sight
    July 16, 2012
    With traffic volumes increasing around the world, many existing road links will need to be upgraded or replaced in coming years The need for new road tunnels is particularly intense in many dense urban areas, due to environmental requirements that mean new road links will have to be installed underground. However, improving existing road tunnel links is providing a very large part of the business for this specialised construction segment at present.