Skip to main content

Roofing repair on busy route

A Cornwall-based roofing specialist has carried out a tricky contract this week, which required the closure of one of the UK's busiest motorways. JR Flat Roofing, based in Redruth, secured a contract with a longstanding client, Moto Hospitality, the UK's biggest provider of motorway service areas. The company worked from scaffolding which was specially designed to sit on a truck, in order for it to be situated on the motorway lane. The footbridge over the busy M1 required some repairs and the contractor was
August 15, 2014 Read time: 1 min
Special repairs have been carried out on a footbridge over the UK’s busy M1 motorway

A Cornwall-based roofing specialist has carried out a tricky contract this week, which required the closure of one of the UK's busiest motorways. 7858 JR Flat Roofing, based in Redruth, secured a contract with a longstanding client, Moto Hospitality, the UK's biggest provider of motorway service areas. The company worked from scaffolding which was specially designed to sit on a truck, in order for it to be situated on the motorway lane. The footbridge over the busy M1 required some repairs and the contractor was brought in to carry out the work. But to ensure safety for the site staff, the motorway had to be closed to traffic temporarily.

For more information on companies in this article

Related Content

  • McCann lights up the M1 in major upgrade
    January 7, 2019
    UK engineering firm J. McCann is installing 500 lighting columns and accessories as part of a major 12km upgrade to one of England’s busiest motorways.
  • EU project looks at highway parking areas
    February 24, 2012
    Under the EU-funded LABEL project there will be an analysis of secure trucking stops. The European Union Road Federation (ERF) - International Road Federation (IRF), Brussels Programme Centre, looks at what it can achieve Whenever we have to travel long distances by car we are faced with the prospect of having to stop in order to refuel our vehicle and to rest a bit. As a consequence motorways can boast the presence of a high number of service stations, usually spread out at 20 to 30km intervals, ready to
  • Hamburg-Finkenwerder airport has new runway surface
    August 21, 2013
    Hamburg’s Finkenwerder airport is now benefiting from a new runway surface following work carried out by contractor KEMNA BAU. The company recently used machines from Dynapac to resurface 36,000m2 of the runway track in Hamburg-Finkenwerder, a facility used by Airbus. The airport handles around 10-15 take-offs and landings/day when aircraft are either undergoing flight testing or being delivered to customers, as well as for deliveries of components by transport aircraft. The project was tricky as the
  • Emergent markets key for formwork sector growth
    May 21, 2014
    Central and south-east Europe are hotbeds for new highway infrastructure projects utilising cutting-edge formwork solutions, while a number of leading formwork manufacturers are also looking at emergent markets for growth. Guy Woodford reports Travelling between Hungary’s capital Budapest and Southern Dalmatia now takes less time thanks to the Pan-European Corridor Vc – European route 73. Numerous tunnels and bridges are erected along the 397km stretch of the European route 73 through Bosnia owing to the