Skip to main content

Roofing repair on busy route

A Cornwall-based roofing specialist has carried out a tricky contract this week, which required the closure of one of the UK's busiest motorways. JR Flat Roofing, based in Redruth, secured a contract with a longstanding client, Moto Hospitality, the UK's biggest provider of motorway service areas. The company worked from scaffolding which was specially designed to sit on a truck, in order for it to be situated on the motorway lane. The footbridge over the busy M1 required some repairs and the contractor was
August 15, 2014 Read time: 1 min
Special repairs have been carried out on a footbridge over the UK’s busy M1 motorway

A Cornwall-based roofing specialist has carried out a tricky contract this week, which required the closure of one of the UK's busiest motorways. 7858 JR Flat Roofing, based in Redruth, secured a contract with a longstanding client, Moto Hospitality, the UK's biggest provider of motorway service areas. The company worked from scaffolding which was specially designed to sit on a truck, in order for it to be situated on the motorway lane. The footbridge over the busy M1 required some repairs and the contractor was brought in to carry out the work. But to ensure safety for the site staff, the motorway had to be closed to traffic temporarily.

For more information on companies in this article

Related Content

  • Brazilian contractor uses novel methods for high quality road
    January 5, 2015
    Cold-in place recycling method provides fast road rebuild in Brazil In Brazil a road contractor has carried out a high quality road rebuilding job, using novel techniques. Contractor Brown Brown is located in Santa Teresinha in the state of Bahia and recently carried out a two-week job for the company to rehabilitate sections of highway BR-381. The highway is an important route in Brazil and runs from Sao Paulo to Belo Horizonte. Highway BR-381 or Rodovia Fernão Dias, as it is called, stretches some 576km
  • Sandvik drilling rigs boost production
    July 9, 2012
    The drill and blast contractor Technical Drilling and Blasting in the United Arab Emirates (UAE) is standardising on Sandvik rock tools for its fleet of drill rigs. The firm operates across Fujeirah, providing quality gabbro aggregates for construction projects in Dubai and Abu Dhabi. Recognised as one of the worlds hardest rocks, gabbro features a typical density in excess of 3tonnes/m, a crushing factor of 10 and a 61% silica content and demand remains strong for this quality construction material. Every
  • Advanced method for South Africa bridge construction
    May 16, 2016
    A sophisticated construction method has been used for the first time in South Africa for a suspended bridge project This novel method of bridge construction was used on a major road upgrade project for the South African National Roads Agency Limited (SANRAL). Main contractor Lonerock Construction, and subcontractor Tzandeboo Construction, used RMD Kwikform’s Megatruss system to construct a 60m-long bridge while suspended mid-air over the live N4 highway. Lonerock Construction’s US$8.5 million (R132
  • Sustainable road development in discussion at Intermat
    February 27, 2012
    An in-depth congress is being held in conjunction with the Intermat exhibition. Visitors to the show will be able to find out about the latest developments in sustainable road construction by attending this congress, which is being organised by the Committee for European Construction Equipment (CECE).