Skip to main content

Roofing repair on busy route

A Cornwall-based roofing specialist has carried out a tricky contract this week, which required the closure of one of the UK's busiest motorways. JR Flat Roofing, based in Redruth, secured a contract with a longstanding client, Moto Hospitality, the UK's biggest provider of motorway service areas. The company worked from scaffolding which was specially designed to sit on a truck, in order for it to be situated on the motorway lane. The footbridge over the busy M1 required some repairs and the contractor was
August 15, 2014 Read time: 1 min
Special repairs have been carried out on a footbridge over the UK’s busy M1 motorway

A Cornwall-based roofing specialist has carried out a tricky contract this week, which required the closure of one of the UK's busiest motorways. 7858 JR Flat Roofing, based in Redruth, secured a contract with a longstanding client, Moto Hospitality, the UK's biggest provider of motorway service areas. The company worked from scaffolding which was specially designed to sit on a truck, in order for it to be situated on the motorway lane. The footbridge over the busy M1 required some repairs and the contractor was brought in to carry out the work. But to ensure safety for the site staff, the motorway had to be closed to traffic temporarily.

For more information on companies in this article

Related Content

  • Importance of road/tunnel drainage systems
    May 8, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports. The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • VIDEO – demolition of UK’s M1 motorway overpass
    April 17, 2015
    Specialist contractor Armac recently demolished a bridge over the UK’s busy M1 motorway. The work was carried out within a tight timeframe as this important route could only be closed for a short period at night over a weekend when traffic would be at its lightest so as to minimise disruption.
  • Innovations in formwork aid project completion
    February 14, 2012
    Innovative formwork solutions are helping to get projects completed on or before time, meaning savings in time and money as Patrick smith reports. The use of flexible, modular formwork to create innovative structures out of concrete is helping to increase productivity and thus drive down completion time and costs.
  • Completion due shortly for UK’s A30 project
    February 11, 2025
    Completion of the UK’s A30 upgrade project is due shortly.