Skip to main content

Roofing repair on busy route

A Cornwall-based roofing specialist has carried out a tricky contract this week, which required the closure of one of the UK's busiest motorways. JR Flat Roofing, based in Redruth, secured a contract with a longstanding client, Moto Hospitality, the UK's biggest provider of motorway service areas. The company worked from scaffolding which was specially designed to sit on a truck, in order for it to be situated on the motorway lane. The footbridge over the busy M1 required some repairs and the contractor was
August 15, 2014 Read time: 1 min
Special repairs have been carried out on a footbridge over the UK’s busy M1 motorway

A Cornwall-based roofing specialist has carried out a tricky contract this week, which required the closure of one of the UK's busiest motorways. 7858 JR Flat Roofing, based in Redruth, secured a contract with a longstanding client, Moto Hospitality, the UK's biggest provider of motorway service areas. The company worked from scaffolding which was specially designed to sit on a truck, in order for it to be situated on the motorway lane. The footbridge over the busy M1 required some repairs and the contractor was brought in to carry out the work. But to ensure safety for the site staff, the motorway had to be closed to traffic temporarily.

For more information on companies in this article

Related Content

  • When the rain comes
    July 18, 2012
    Statistics show that wet weather and the dark is not the best mix for driving, but road markings offer a safety solution While good road markings are essential any time of the day, it is perhaps at night when roads are wet that they can offer extra guidance. Statistics are said to reveal that an estimated 50% of all accidents happen during the night when it rains but such conditions occur only 10% of the time and when there are usually less vehicles on the road. Indeed, at the 1st Road Marking Symposium hel
  • The hanging Honda
    August 10, 2018
    Police in Toronto are still mystified as to how and why a stripped-out Honda was left dangling from a busy bridge. At first it was thought the car had been placed there as part of a movie shoot, but it was quickly realised that this was not the case and no request had been filed to carry out such a stunt. The car was stripped of any identification as well as many mechanical components, reducing its weight sufficiently for it to be suspended from a single cable. After a period left hanging, the vehicle was l
  • Busy bridge in Beijing replaced quickly
    March 31, 2016
    The replacement of a very busy road bridge in China’s capital Beijing has been carried out successfully. Due to the volume of traffic using the bridge during week days, the work had to be carried out quickly so as to minimise traffic disruption. But despite being carried out in the centre of Beijing, the replacement work for the Sanyuan Bridge just took 43 hours from start to completion.
  • Road markings important for road safety
    February 20, 2012
    Manufacturers are constantly upgrading marking materials and equipment. Now those responsible for highways are being asked to do more as Patrick Smith reports. A recent report claimed that nearly one-third of the length of Britain's single carriageway A-roads have white lines so worn out that they do not meet recognised standards. According to the LifeLines Report, an assessment of more than 2,400km of the road network, Britain's most dangerous roads have the most worn-out centre line markings of all, leavi