Skip to main content

Roofing repair on busy route

A Cornwall-based roofing specialist has carried out a tricky contract this week, which required the closure of one of the UK's busiest motorways. JR Flat Roofing, based in Redruth, secured a contract with a longstanding client, Moto Hospitality, the UK's biggest provider of motorway service areas. The company worked from scaffolding which was specially designed to sit on a truck, in order for it to be situated on the motorway lane. The footbridge over the busy M1 required some repairs and the contractor was
August 15, 2014 Read time: 1 min
Special repairs have been carried out on a footbridge over the UK’s busy M1 motorway

A Cornwall-based roofing specialist has carried out a tricky contract this week, which required the closure of one of the UK's busiest motorways. 7858 JR Flat Roofing, based in Redruth, secured a contract with a longstanding client, Moto Hospitality, the UK's biggest provider of motorway service areas. The company worked from scaffolding which was specially designed to sit on a truck, in order for it to be situated on the motorway lane. The footbridge over the busy M1 required some repairs and the contractor was brought in to carry out the work. But to ensure safety for the site staff, the motorway had to be closed to traffic temporarily.

For more information on companies in this article

Related Content

  • Developments in concrete pavers boosts quality
    July 13, 2012
    The latest technology continues to improve the quality of concrete paving while contractors are also benefiting from more adaptable equipment - Mike Woof reports For many concrete paving applications, versatility is required rather than a high production rate. Leading paver manufacturers such as GOMACO, Power Curbers, Terex and Wirtgen all offer high mobility machines that can be adjusted to cope with an array of tasks. For a contractor, the advantage of these smaller pavers is that they can be configured q
  • Excavator delivers high productivity
    February 16, 2012
    A Case CX700B excavator is delivering high productivity for an extraction application in Germany's volcanic Eifel region.
  • A road challenge for Zimbabwe
    November 8, 2023
    Construction work is finally underway for a major new highway link in Zimbabwe after many years of false starts.
  • Geosynthetic drainage technology developments
    June 13, 2012
    An innovative solution to providing vital, low-impact surface water control for one of Britain’s largest local authority road schemes is said to have been recently achieved using Hydro International’s (HI) Hydro Vortex Drop Shaft  ow control technology. The new 7km bypass built by Costain at Church Village, near Pontypridd, South Wales, required careful planning to minimise its effect on the countryside and the local environment. Rhondda Cynon Taff Council needed to bypass Church Village to reduce traf c