Skip to main content

Rockmore’s new DTH hammer drill

Rockmore International is adding its new ROK 550T drill to its T Series DTH hammer line. The T Series DTH hammers are TUBELESS and use drill bits featuring industry standard shank connections without the embedded plastic blow tube/foot valve. The firm’s first T Series DTH model was the ROK 600T, a 152mm class model that uses a tubeless QL6/QL60 bit shank. The company then expanded the T Series with the ROK 60T-360T hammers that use the IR 360 bit shank without the blow tube/foot valve. And Rockmore is now
March 12, 2018 Read time: 2 mins
Rockmore’s new DTH hammer drill offers high performance

5087 Rockmore International is adding its new ROK 550T drill to its T Series DTH hammer line. The T Series DTH hammers are TUBELESS and use drill bits featuring industry standard shank connections without the embedded plastic blow tube/foot valve.

The firm’s first T Series DTH model was the ROK 600T, a 152mm class model that uses a tubeless QL6/QL60 bit shank. The company then expanded the T Series with the ROK 60T-360T hammers that use the IR 360 bit shank without the blow tube/foot valve. And Rockmore is now extending the T series with its 127mm class ROK 550T, which uses the industry standard QL5/QL50 bit shank, but with the blow tube/foot valve removed.  With high performance drilling characteristics rated for drilling 140-152mmdiameter holes, the ROK 550T is suitable for blast-hole applications in extraction and construction markets.

As with all Rockmore DTH hammers, the new ROK 550T is said to take advantage of the firm’s patented SonicFlow technology, which optimises airflow by simplifying and streamlining the air paths to minimize back flow and turbulence, delivering more energy to the piston. Field testing of the SonicFlow design was determined to result in faster penetration rates and greater overall DTH hammer efficiency.

For more information on companies in this article

Related Content

  • Sandvik Construction: return of the Ranger series of drill rigs
    March 6, 2014
    Sandvik Construction has unveiled a new and improved version of the former best-selling Ranger series of surface top hammer drill rigs. The new version, Sandvik Ranger DX800, combines the strong heritage of the famous surface drill rigs with the latest drilling innovations and a significantly smaller appetite for fuel, said the company. Known to many by their former name, Ranger, Sandvik’s DX series surface top hammer drill rigs all feature a revolving superstructure enabling large drilling coverage from
  • Sandvik Construction: return of the Ranger series of drill rigs
    January 6, 2017
    Sandvik Construction has unveiled a new and improved version of the former best-selling Ranger series of surface top hammer drill rigs. The new version, Sandvik Ranger DX800, combines the strong heritage of the famous surface drill rigs with the latest drilling innovations and a significantly smaller appetite for fuel, said the company. Known to many by their former name, Ranger, Sandvik’s DX series surface top hammer drill rigs all feature a revolving superstructure enabling large drilling coverage from
  • Energy efficient cement testing solution
    February 27, 2012
    In determining the mechanical strength of cement, the European Standard EN 196 prescribes both compressive and flexural tests, so when Italian company Tecnotest designed its current generation of cement testing machines, the aim was to obtain highly accurate results over the full scale despite the wide range involved by implementing a dual scale in a single test bay, using load cells as dynamometers.
  • Indeco hammers carry out key excavation work in Italian tunnel project
    December 2, 2014
    Indeco breakers have been instrumental in excavating the Serra Rotonda Tunnel along the new Salerno-Reggio Calabria highway in southern Italy - Lucio Garofalo reports The A3 Salerno-Reggio-Calabria highway runs for some 443km, linking the A1 Milano-Napoli with the southernmost part of the country. A tunnel is a major link on this highway and was originally built between 1966 and 1974 in an area where road construction can be a challenge due to orography, geology and seismicity. Since 2001, the A3 has bee