Skip to main content

Rockmore International unveils ROK 550T drill

Rockmore International has launched its new ROK 550T drill for the European market. The latest addition to the company’s T Series DTH hammer line, the 127mm class product uses the industry-standard QL5/QL50 bit shank, but with the blow tube/foot valve (plastic tube) removed. Pejman Eghdami, Rockmore executive vice president, said: “Plastic parts do tend to break in deep hole drilling, causing the hammer to stop leading to costly downtime. Others have tried removing the plastic tube but they lose a lot of
April 26, 2018 Read time: 2 mins
Rockmore executive vice president Pejman Eghdami with the new ROK 550T drill

Rockmore International has launched its new ROK 550T drill for the European market. The latest addition to the company’s T Series DTH hammer line, the 127mm class product uses the industry-standard QL5/QL50 bit shank, but with the blow tube/foot valve (plastic tube) removed. 

Pejman Eghdami, Rockmore executive vice president, said: “Plastic parts do tend to break in deep hole drilling, causing the hammer to stop leading to costly downtime. Others have tried removing the plastic tube but they lose a lot of performance in penetration rates. We’ve designed uniquely around that [so that performance can be maintained].”

With high performance drilling characteristics rated for drilling 140-152mm diameter holes, the ROK 550T is said to be ideal for blast-hole applications involving, among others, geotechnical and geothermal contractors. It is also well suited to water well drilling work.

Rockmore’s first T Series DTH model was the ROK 600T, a 152mm class model that uses a tubeless QL6/QL60 bit shank. The company then expanded the T Series with the ROK 60T-360T hammers that use the IR 360 bit shank without the blow tube/foot valve.

As with all Rockmore DTH hammers, the new ROK 550T is also said to take advantage of the firm’s patented SonicFlow technology, which optimises airflow by simplifying and streamlining the air paths to minimise back flow and turbulence, delivering more energy to the piston. Field testing of the SonicFlow design was determined to result in faster penetration rates and greater overall DTH hammer efficiency.

Related Content

  • Bonfiglioli’s 705XT gearbox and 605WE electric drive highlight macro trends
    April 24, 2018
    Packing a bigger punch in a smaller package and the rise of the electric motor are two big themes underlined by new products from Bonfiglioli: the 705XT gearbox and the 605WE electric drive. Operating globally with an annual turnover of €808m (€300m of which comes from construction equipment), Bonfiglioli manufactures gearboxes, electric motors and inverters for products that range from production line robots to wind turbines. “In terms of development and innovation we are following macro trends: increased
  • VSS has improved its emulsion technology
    January 6, 2017
    VSS Macropaver is introducing an improved version of its successful slurry surfacing equipment, as well as upgraded variants of the mobile Minimac and skid-mounted emulsion plants. Vice president Doug Hogue said that the upgrades to the slurry surfacing machine will increase its performance as well as its ability to handle tough road repair jobs. He said, “We’ve a lot of updates on this machine. One of the big things is the fibre feeding.”
  • VSS has improved its emulsion technology
    March 11, 2014
    VSS Macropaver is introducing an improved version of its successful slurry surfacing equipment, as well as upgraded variants of the mobile Minimac and skid-mounted emulsion plants. Vice president Doug Hogue said that the upgrades to the slurry surfacing machine will increase its performance as well as its ability to handle tough road repair jobs. He said, “We’ve a lot of updates on this machine. One of the big things is the fibre feeding.”
  • Machine control technology shortens road contract
    May 28, 2013
    The use of sophisticated machine control technology has helped halve the schedule required for a road contract – Jeff Winke. By using the latest machine control systems on the equipment fleet, a US contractor has managed to halve worker hours, machine time and overall costs. “We chopped 50% off the contract schedule,” said Jim Swenson, licensed professional land surveyor for Oregon Mainline Paving based in McMinnville, Oregon. “The project was completed a year ahead of the two-year schedule,” he explained