Skip to main content

Rocket powered

School children competed in Malaysia with high speed model cars. The British team has built its vehicle from balsawood in a bid to win the speed challenge. The 25cm long rocket car is powered by compressed air and can travel up to 20m in 0.5 of a second.
June 24, 2013 Read time: 1 min
School children competed in Malaysia with high speed model cars. The British team has built its vehicle from balsawood in a bid to win the speed challenge. The 25cm long rocket car is powered by compressed air and can travel up to 20m in 0.5 of a second.

Related Content

  • Sandvik plant increases productivity
    December 3, 2012
    Lafarge Aggregates Malaysia’s Kulai quarry is designed to the highest standards of safety, productivity and efficiency With an emphasis on high standards of safe, efficient and productive operations, Lafarge Aggregates Malaysia recently installed new quarry plant. It became operational earlier this year after Sandvik Mining and Construction Malaysia designed and installed a 250tonnes/hour, four-stage crushing and screening plant in Kulai, Johor, some 270km south of the capital Kuala Lumpur. It is now fully
  • Utility machines with cutting edge design and efficiency
    May 29, 2013
    Utility machines with standout efficiency and cutting-edge cab design have come onto the market during the first few months of 2013. Guy Woodford looks at some of them. Case Construction Equipment and New Holland Construction have brought out what they claim are the market’s first Tier 4 Final emissions standard midi-excavators. The CX75C SR and CX80C models from Case are said to offer more performance power and greater operator cabin comfort than previous models. Tier 4 Final standards are said to have bee
  • Vögele MT 3000-2 for Austria A2 motorway
    May 14, 2014
    Road construction work with moving traffic always represents a major challenge. This is especially true when only one lane can be closed, consequently leaving little space for working and manoeuvring. That was exactly the case for a rehabilitation project on the A2 motorway in Austria between Vienna and Graz near Schäffern. However, the job was further complicated by another factor: all access roads to the job site were roughly 1km apart. Ensuring an uninterrupted supply of mix to the paver under these
  • Vinci bids for construction of new section of German A 20 motorway
    August 23, 2013
    France-based infrastructure group Vinci has submitted a bid to construct a new section of the A 20 motorway in Germany between Bad Segeberg and Bremerhaven. The works will include a near 6.5km-long tunnel under the river Elbe between Glückstadt and Drochtersen and a section of the A 26 motorway to Hamburg. The bid by Vinci provides for a private-public-partnership model under which Vinci and the German government would share the estimated project cost of around €2 billion. According to Vinci's bid, const