Skip to main content

Rocket powered

School children competed in Malaysia with high speed model cars. The British team has built its vehicle from balsawood in a bid to win the speed challenge. The 25cm long rocket car is powered by compressed air and can travel up to 20m in 0.5 of a second.
June 24, 2013 Read time: 1 min
School children competed in Malaysia with high speed model cars. The British team has built its vehicle from balsawood in a bid to win the speed challenge. The 25cm long rocket car is powered by compressed air and can travel up to 20m in 0.5 of a second.

Related Content

  • Strategic road plan announced in the UK
    May 23, 2023
    A statement from National Highways in the UK said the emphasis is on boosting the economy “in an environmentally sustainable way” up to 2030 and beyond.
  • Hamm is investing in compaction equipment and manufacturing
    January 7, 2015
    The Wirtgen Group has invested heavily in its Hamm compaction equipment business - Mike Woof writes New compaction models and a brand new factory are strong examples of how the Wirtgen Group has been investing heavily in its Hamm road roller operation. Four new compactors are being launched, two each for the soil compaction and asphalt compaction markets. The company is launching the new H5i and H7i single drum soil compactors as well as the DV+70i and DV+90i twin drum asphalt compactors.
  • Bridging the gap in African infrastructure
    December 20, 2013
    Leading formwork manufacturers have secured some impressive contracts in Africa, as the continent’s transport infrastructure continues to improve at a rapid pace. Meanwhile, other bridgework equipment companies are also seeing their products in demand in Africa, as well as North America and Australia.
  • Elonroad’s electric road and recharging lane for buses in Lund
    April 17, 2019
    Sweden’s Transport Administration (Trafikverket) has awarded a contract to the Elväg Syd consortium for an electric and recharging bus lane in the city of Lund. The demonstration area will be built in the bus lane along 1km of Getingevägen Road near central Lund. Construction will begin during the first quarter of 2020 and last for three years. The project’s budget is €9.3 million of which Trafikverket will contribute €8.3 million with the other consortium players supplying the remaining funds. Lun