Skip to main content

Road planing

In New York, a pilot and his two passengers had a lucky escape when the engine of their light aircraft failed. And road construction workers played a key role in ensuring that there were no casualties in the incident. When the road crew spotted the Piper Cherokee gliding in, dead stick, towards the Major Deegan Expressway they realised what was about to happen and parked their vehicles so as to halt traffic on the busy roadway. The rapid descent meant that the pilot brought the aircraft down hard onto the s
May 14, 2014 Read time: 2 mins
In New York, a pilot and his two passengers had a lucky escape when the engine of their light aircraft failed. And road construction workers played a key role in ensuring that there were no casualties in the incident. When the road crew spotted the Piper Cherokee gliding in, dead stick, towards the Major Deegan Expressway they realised what was about to happen and parked their vehicles so as to halt traffic on the busy roadway. The rapid descent meant that the pilot brought the aircraft down hard onto the snowy roadway and its undercarriage collapsed with the impact, but the occupants were unharmed, and the aircraft may even prove repairable. The pilot had been treating his passengers to a flypast of the Statue of Liberty when the engine failed and he immediately made a mayday call, with air traffic control trying to guide him into the nearby La Guardia Airport. But the pilot realised he could not reach the airport and, seeing the busy highway just a short distance away, made a split decision to use it as a landing strip instead. His luck was compounded by the quick thinking of the road crew when they stopped the traffic flow to give the pilot sufficient space to land safely. After the aircraft came to a halt the occupants climbed out unharmed and the pilot then used his cellphone to call for a breakdown truck for what was probably its most unusual ever load. The pilot was also concerned that he would be fined for parking the aircraft illegally on the busy Bronx highway but even in this respect he had good luck and avoided a ticket. Motorists stuck in the ensuing traffic jam on the expressway that particular Saturday afternoon had to console themselves with the fact that this was a highly unusual event.

Related Content

  • Cost effective road maintenance
    February 8, 2012
    Highway maintenance and repair is an easy target for cuts in highway budgets, but there are cost-effective measures that can be adopted as Patrick Smith reports. Road maintenance is an increasingly important industry that spans a worldwide market. Awareness of the need for a stable and sustainable international infrastructure, maintenance and creative rural road technologies are taking a stronger role as viable sources for a cost-effective means of preserving, developing and prolonging the life of roads wit
  • Cost effective road maintenance
    February 7, 2012
    Highway maintenance and repair is an easy target for cuts in highway budgets, but there are cost-effective measures that can be adopted as Patrick Smith reports
  • Changing policy for Europe’s road funding?
    August 27, 2013
    The 2011 EC White Paper on Transport acknowledges that transport is the backbone of Europe’s economy, directly employing 10 million people and accounting for approximately 5% of EU GDP. In addition, it recognises that ‘infrastructure shapes mobility’ and that ‘curbing mobility is not an option’. Given the importance policymakers place on the ability to move people and goods seamlessly across Europe, it becomes rather hard to explain why they have neglected for so long the main ‘vehicle’ for mobility acro
  • Asphalt resurfacing at Miami International Airport
    February 8, 2012
    Improvements worth US$30 million are being carried out at Miami International Airport. The work includes runway resurfacing with specialist contractors having been brought in to handle the project. This is a busy facility handling some 34 million passengers/year and the work is being carried out over a period of 454 days in all, starting in September 2009 and due to finish in December 2010. The focus of attention is the upgrade to the airport's second longest runway, 8R 26L as well as the adjoining M and N