Skip to main content

Road planing

In New York, a pilot and his two passengers had a lucky escape when the engine of their light aircraft failed. And road construction workers played a key role in ensuring that there were no casualties in the incident. When the road crew spotted the Piper Cherokee gliding in, dead stick, towards the Major Deegan Expressway they realised what was about to happen and parked their vehicles so as to halt traffic on the busy roadway. The rapid descent meant that the pilot brought the aircraft down hard onto the s
May 14, 2014 Read time: 2 mins
In New York, a pilot and his two passengers had a lucky escape when the engine of their light aircraft failed. And road construction workers played a key role in ensuring that there were no casualties in the incident. When the road crew spotted the Piper Cherokee gliding in, dead stick, towards the Major Deegan Expressway they realised what was about to happen and parked their vehicles so as to halt traffic on the busy roadway. The rapid descent meant that the pilot brought the aircraft down hard onto the snowy roadway and its undercarriage collapsed with the impact, but the occupants were unharmed, and the aircraft may even prove repairable. The pilot had been treating his passengers to a flypast of the Statue of Liberty when the engine failed and he immediately made a mayday call, with air traffic control trying to guide him into the nearby La Guardia Airport. But the pilot realised he could not reach the airport and, seeing the busy highway just a short distance away, made a split decision to use it as a landing strip instead. His luck was compounded by the quick thinking of the road crew when they stopped the traffic flow to give the pilot sufficient space to land safely. After the aircraft came to a halt the occupants climbed out unharmed and the pilot then used his cellphone to call for a breakdown truck for what was probably its most unusual ever load. The pilot was also concerned that he would be fined for parking the aircraft illegally on the busy Bronx highway but even in this respect he had good luck and avoided a ticket. Motorists stuck in the ensuing traffic jam on the expressway that particular Saturday afternoon had to console themselves with the fact that this was a highly unusual event.

Related Content

  • London’s transportation network requires revolutionary approach to build capacity
    November 13, 2015
    London requires a radical new strategy to delivering the transportation development the city will need to cope with its fast growing population. Martin Tugwell, Transport Programme Director for England’s Economic Heartland Strategic Alliance said, “A road network fit for the world’s fifth largest economy cannot be planned from London: it is time for a revolution in approach, one that is focused on meeting our needs.”
  • Bridge formwork solutions complete big bridge picture
    July 2, 2014
    Advanced bridge formwork solutions are allowing contractors to complete vital major highway infrastructure projects covering Norway, Sweden, Estonia and Poland. Guy Woodford reports Building the Labbdalen bridges in Norway is a key feature of the E6 highway improvement programme. Main project contractor HÆHRE tasked RMD Kwikform and Teknikk with supplying a complete formwork and shoring solution that could tackle the challenging Norwegian terrain, whilst preserving the environment. Situated two hours
  • Connected Tech for Construction Continuity
    December 11, 2020
    No one could have predicted the situation we found ourselves in in 2020, with a global pandemic bringing the economy to its knees, projects delayed overnight, rapid restarts, remote management, and challenging labor dynamics.
  • A vision of roads
    September 3, 2012
    By 2040 European roads could be built differently, and hopefully be safer, according to the EU research programme NR2C