Skip to main content

Road construction in Ghana

A new generation asphalt plant has proved its worth for the construction of an important road link in Ghana.
August 23, 2022 Read time: 2 mins
A mobile plant from Lintec & Linnhoff has provided asphalt for the Tema Roundabout upgrade in Ghana

The Linnhoff TSD1500 MobileMix asphalt plant was used for the project at the busy Tema Motorway Roundabout in southern Ghana. The roundabout had to be improved as it was suffering from heavy congestion at peak periods, with traffic queues often extending up to 1km.

The ‘Project for the Improvement of Ghanaian International Corridors’ was implemented – one of the priority projects proposed in the ‘West Africa Growth Ring Corridor Master Plan’. A US$57million grant from the Japan International Cooperation Agency (JICA) was provided to help with the work.  The Motorway Interchange at Tema, Ghana’s largest port city, is the crossroads of two of the country’s busiest international corridors: National Highway 1 (N1), which runs along the Ghanaian coastline virtually all the way between its borders with Ivory Coast and Togo, and, in the far east, National Highway 2 (N2), its main north-south highway which runs to the border with Burkina Faso.

In February 2018, work on the Tema Motorway Interchange began, transforming the roundabout into an interchange with an underpass, the construction of a 2.1km three-lane dual carriageway with 730m underpass on the N1 and improvement of 1.9km of two-lane dual carriageway on the N2. It also included the paving of five service roads and eight ramps for right-turning traffic, a 190m-long box-culvert underpass, four pedestrian bridges, traffic signals and street lighting.

The Linnhoff TSD1500 MobileMix Asphalt Plant produced around 52,000tonnes of hot mix asphalt for the construction of a total of 150,000m2 of asphalt, for use in the base, binder and wearing courses.

The roundabout upgrade is improving the capacity, safety, and efficiency of transport and freight, leading to vastly improved logistics to and from Tema Port, boosting trade.

For more information on companies in this article

Related Content

  • Bangladesh highway contract awarded
    November 15, 2022
    A major Bangladesh highway contract has been awarded.
  • Preparing a raceway with milling machinery
    November 6, 2018
    Contractor Continental Milling has played an important role in refurbishing the famous Pikes Peak Highway route in the US state of Colorado Working as a subcontractor for the Kiewit Corporation on the mill and overlay project, the Continental Milling crew was responsible for milling patches up to 213.4m long on the winding, two-lane highway known for its switchback turns and scenic vistas. The work was needed to prepare the route for the annual Pikes Peak International Hill Climb. Pikes Peak Highway fea
  • Busy California highway upgrade is underway
    January 24, 2022
    Work is well underway on the planned upgrade for a busy California highway.
  • Latest VMS keeps world’s motorists moving safely
    April 10, 2013
    VMS for what is thought to be the longest road tunnel in the Middle East, and the installation of the latest VMS technology in Canada’s oldest national park to help motorists travelling through it are among the projects discussed by Guy Woodford. A large volume of VMS from Italian firm Solari has been installed in the new 4.2km-long Zayed Street Tunnel in Abu Dhabi – thought to be the longest in the Middle East. The Solari VMS supply consisted of 204 lane control signs, with Red, Yellow and Green LED pre-de