Skip to main content

Repairs needed

A Chinese driver became so angry with the faults in his newly acquired VW that he drove back to the dealership where he had bought the car and crashed it through the front window. The man had returned to the dealership on a number of occasions to have faults repaired under warranty. He was offered a number of upgrades but remained dissatisfied and at first, took the dealership to court, with the firm then responding with a counter suit of its own. Becoming enraged with this process, the car owner then opted
June 27, 2016 Read time: 1 min
A Chinese driver became so angry with the faults in his newly acquired VW that he drove back to the dealership where he had bought the car and crashed it through the front window. The man had returned to the dealership on a number of occasions to have faults repaired under warranty. He was offered a number of upgrades but remained dissatisfied and at first, took the dealership to court, with the firm then responding with a counter suit of its own. Becoming enraged with this process, the car owner then opted for this radical option instead. He was arrested for causing the damage to the dealership, which had to cease trading until repairs could be made to the front of the building.

Related Content

  • Developments in hybrid vehicles
    February 27, 2012
    There is an array of future vehicle solutions in development - Mike Woof reports. Ever since Henry Ford's Model T showed that the motor car could provide transport for ordinary people rather than being an exclusive toy of the rich, vehicle numbers have exploded. In every country around the world, vehicle ownership continues to grow.
  • Bridge formwork solutions complete big bridge picture
    July 2, 2014
    Advanced bridge formwork solutions are allowing contractors to complete vital major highway infrastructure projects covering Norway, Sweden, Estonia and Poland. Guy Woodford reports Building the Labbdalen bridges in Norway is a key feature of the E6 highway improvement programme. Main project contractor HÆHRE tasked RMD Kwikform and Teknikk with supplying a complete formwork and shoring solution that could tackle the challenging Norwegian terrain, whilst preserving the environment. Situated two hours
  • Topcon: A revolution in construction technology’s coming
    July 7, 2021
    The construction equipment industry is at a turning point. Topcon’s senior leaders believe that we are about to see a huge surge in the adoption of new construction technologies. The time is ripe as a new, younger and more tech-savvy generation comes to the fore. Governments could save billions, and where does the smartphone fit in?
  • Legal tangle over Polish highway project
    February 29, 2012
    The complex legal tangle over Poland's troubled A2 highway project is continuing to develop.