Skip to main content

Remax 1111 Maxi crusher enlarges SBM’s Remax series

A new mobile impact crusher, the Remax 1111 Maxi, enlarges SBM’s Remax series, and is said to combine decades of know-how of SBM and MFL. The 29.8tonne (without options) track-mounted plant belongs Remax series compact class, and its total weight, including a secondary screening unit, is 34.5tonnes. Its dimensions mean the plant can be transported simply and easily.
March 2, 2016 Read time: 2 mins
The Remax 1111 Maxi impact crusher enlarges SBM’s Remax series. (Copyright: SBM Mineral Processing)
A new mobile impact crusher, the Remax 1111 Maxi, enlarges 7156 SBM Mineral Processing’s Remax series, and is said to combine decades of know-how of SBM and MFL.

The 29.8tonne (without options) track-mounted plant belongs Remax series compact class, and its total weight, including a secondary screening unit, is 34.5tonnes. Its dimensions mean the plant can be transported simply and easily.

The standard hopper size is 3.3m³ but hydraulically folding hopper sides increase the hopper volume to 6m³.

“Optimum material flow is assured due to the integrated two-deck pre-screening unit with lateral discharge conveyor, the aggressive intake geometry and the discharge chute below the impact crusher for especially gentle transfer to the main discharge conveyor,” says SBM.

The heart piece of the Maxi is the impact crusher RCI 11/11/4 with a rotor diameter of 1,100mm and a system width of 1,100mm, which has been developed from the best of both SBM and MFL.

The Remax 1111 Maxi is said to be ideal for recycling applications due to the over-belt magnetic separator that can be raised and lowered hydraulically; the wind sifter for light fractions, and the one-deck secondary screen with a banana-shaped screening surface with a screen length of 3m.

The plant uses a diesel-electric drive with optional external power supply. The electric drive of the crusher produces 132kW, while an intelligent control system and software completes the full package.

For more information on companies in this article

Related Content

  • Asphalt plants looking at greener production systems
    April 10, 2012
    A wide variety of new equipment and technology to assist production at asphalt plants is about to be launched onto the market, while asphalt producers are continuing to look at greener working practices. Guy Woodford reports. Lintec, in partnership with Loesche, recently created what they say is the world’s first containerised Coal Mill Plant for independent coal dust supply at the jobsite which offers mobility and high economic efficiency through the substitution of gas or oil with coal.
  • Formwork plays a leading role in global infrastructure projects
    June 13, 2012
    New and highly regarded existing formwork systems have been used in major recent transport-related construction projects across the globe. Guy Woodford looks at some of their applications The multi-million dollar Mississippi River Bridge project in the United State is creating a vital new gateway between Illinois and Missouri. Central to the project is the realignment and reconstruction of Interstate 70 and a new landmark bridge, featuring two pylons projecting vertically from the Mississippi river bed w
  • Innovative road construction
    February 19, 2024
    Wirtgen is introducing an innovative concept for road construction in the shape of its new WRC 240(i) rock crusher. The machine has been developed from the firm’s proven soil stabiliser technology and is designed to break coarse rocks in-situ, as found in hand-packed pavement layers.
  • Producing recycled materials at an airport for surface use
    October 1, 2018
    Recycling of materials has been carried out at Cologne/Bonn Airport in a move to boost efficiency Using the Wirtgen KMA 220 mobile cold recycling mixing plant allows road construction materials to be recycled or upgraded onsite and avoids the need for numerous transport trips. The system is also economical, as became clear from a job at Cologne/Bonn airport at the end of 2017. There the plant, located immediately next to the job site, produced around 11,000tonnes of materials for a hydraulically bound ba