Skip to main content

Reflective values from DELTA

Danish company DELTA is introducing its new RetroSign GR3 Retroreflectometer for quality control and asset management of road signs and retroreflective materials with laboratory precision. The company says that to achieve these goals the triple geometry retroreflectometer is offered with GPS and RFID (radio frequency identification) reader.
March 16, 2012 Read time: 2 mins
Danish company 199 Delta is introducing its new RetroSign GR3 Retroreflectometer for quality control and asset management of road signs and retroreflective materials with laboratory precision.

The company says that to achieve these goals the triple geometry retroreflectometer is offered with GPS and RFID (radio frequency identification) reader.

The handheld instrument is used for measuring the retroreflection of traffic signs. It measures the coefficient of retroreflection (RA) according to US and European standards.

"The triple geometry facilitates simultaneous measurements at various observation angles as proposed by ASTM (The 3930 American Society for Testing and Materials). The RetroSign GR3 measures simultaneously at observation angles at 0.2/0.33º, 0.5º, and 1º," says DELTA.

"The point aperture geometry specified by ASTM ensures realistic and accurate readings replicating realistic driving conditions. Furthermore it enables the user to determine if a microprismatic sign sheeting material has been applied correctly.

Due to the DELTA proprietary gradient index ultra hard coating (UHC) technology the sensor response meets the ASTM 1709 requirements combining the CIE (International Commission on Illumination) eye response and CIE illuminant A." DELTA says that the RetroSign GR3 is designed to easily interface with current and future ID tagging and asset management systems, and the internal memory stores up to 250,000 readings, "which essentially means that the instrument never runs out of memory."

For more information on companies in this article

Related Content

  • Infrastructure condition warnings possible from research project
    November 18, 2016
    Advanced research could provide warnings as to damage to infrastructure. The research project has been carried out jointly by the National Physical Laboratory and University of Strathclyde. This uses mathematical techniques to provide early warning signals of structural damage in civil megastructures. The technique uses tipping point analysis to review data from structural health sensors on civil constructions, identifying early warning signs of upcoming damage. According to the research partners, this is f
  • Macismo announces 8-year licensing deal in North America at the PPRS Paris 2015 pavement preservation and recycling summit
    February 24, 2015
    Doug Shipsey, founder and owner of Macismo International, announced an 8-year licensing agreement with Bonsal American at PPRS 2015 Paris, the pavement preservation and recycling summit. The deal will be the company’s bridgehead into the giant North American market for its innovative Macfix cold asphalt additive that allows repair material to be laid in temperatures from -10⁰C to +60⁰C. According to Shipsey, his Macfix additive is not only resistant to extreme temperature swings, it is also water resistant.
  • Asphalt plant technology meets market needs
    February 16, 2012
    Plants for mixing asphalt are becoming more sophisticated than ever, while users are looking for ecological and technological benefits. Patrick Smith reports. When the Adige Bitumi Group decided to renew its old M 260 plant it chose to collaborate with Marini for the design and development of a plant with production of 280-300tonnes/hour.
  • Tunnelling challenge on German project
    June 13, 2012
    A massive construction project has been underway deep in the heart of the Schnecktal valley area in Germany. From the surface, though, you would never be able to tell. The majority of the work is underground, as a joint-venture team led by German contractor Wayss and Freytag Ingenieurbau builds the nearly 7km long Finne Tunnel. After a few years of tunnel boring operations, the contractor is at work finishing the interior of the tunnel, slipforming first the tunnel’s floor and then a walkway with its GOMACO