Skip to main content

REBLOC barriers for Antwerp’s Oosterweel Link

Effective noise protection is an essential part of road infrastructure- both temporarily during construction and permanently along the finished road.
October 31, 2022 Read time: 2 mins
REBLOC’s noise and safety barrier system for Antwerp’s Oosterweel Link is 1.3km in length and includes 5,300m² of REBLOC NBL100X_400_5 barrier (image courtesy of REBLOC)

For one of the largest road infrastructure projects in Belgium, REBLOC, along with its local partner De Bonte Group, is providing free-standing concrete safety barriers with integrated noise barrier panels.

The solution is for the Oosterweel Link – Right Bank R1 – E19 project, around Antwerp. Rebloc was commissioned by TM ROCO, an association of Belgian construction companies and managed by LANTIS - set up by the Flemish government to ensure the smooth running of the Oosterweel Link project.

Oosterweel Link is a 15km motorway that will complete the city’s R1 ring road. Construction started in 2018 with all work on the ring road set for completion in 2030. The Antwerp ring road is a key part of the Trans-European Transport (TEN-T) Core Network, a European Union cross-border initiative to enhance major road and rail routes.

The barrier system from REBLOC is 1.3km in length and includes 5,300m² of REBLOC NBL100X_400_5 barrier, installed between the end of May and mid-June as a temporary sound barrier during construction works.

The construction of a conventional noise barrier is often complicated by various ground and underground installations, such as cables, drainage systems and various pipelines. But REBLOC offers free-standing concrete safety barriers with integrated noise barrier panels. This combination of noise and safety barrier is tested according to EN 1317-2 to meet the required safety and quality standards in Europe.

The noise barrier itself is tested for noise protection in accordance with EN 1793. This space-saving system offers solutions for containment levels H2 and H4b for total heights from 2-6m and above at a very slim overall width. Thanks to this combined system, REBLOC says that the noise barrier can be placed closer to the noise source, resulting in reduced height or an improved noise protection effect. Also, due to the system’s modular design, various highly absorbent panels made of wood-concrete, aluminum or acrylic glass can be combined to allow for numerous architectural design options.

REBLOC‘s space-saving systems leave more room for traffic lanes. The noise barrier can be moved quickly and easily - a great advantage for temporary application or when future road layout changes are planned.

For more information on companies in this article

Related Content

  • Temporary acoustic barrier absorbs noise
    March 14, 2012
    The work of Echo Barrier was highlighted at a prestigious Institute of Acoustics (IOA) sponsored awards ceremony held at the House of Commons. The company, which develops and supplies temporary acoustic barriers for use on major construction projects to reduce noise pollution, was highly commended for its Echo H1 barrier and range of products during the 2011 John Connell Awards.
  • Out of sight
    July 16, 2012
    With traffic volumes increasing around the world, many existing road links will need to be upgraded or replaced in coming years The need for new road tunnels is particularly intense in many dense urban areas, due to environmental requirements that mean new road links will have to be installed underground. However, improving existing road tunnel links is providing a very large part of the business for this specialised construction segment at present.
  • Forming iconic structures
    July 18, 2012
    Specially designed and constructed formwork is being used to create some iconic bridges worldwide The Golden Ears Bridge over the Fraser River will unite the municipalities of Richmond, New Westminister and Delta in the scenic British Columbia province of Canada. The bridge, part of a CAD$800 million (US$670 million) project, is an 'extra dosed' cable stayed bridge, which means the deck will be supported by both cables and the structure itself. This design reduces the overall height of the two towers as req
  • ERF and Greek associations team up for road safety event in Athens
    March 13, 2015
    The ERF has teamed up with the Greek road safety associations to organise the Technical Conference on Road Infrastructure Safety Equipment in Athens this month. The financial crisis took its toll on Greek infrastructure development and by 2011 the government had frozen key motorway projects aimed at completing the Greek Trans-European Road Network. But following lengthy negotiations between Greek authorities, financial institutions and the European Commission, a deal was struck in 2014 to re-launch these im