Skip to main content

Pushing boundaries with Fliegl’s Thermo push-off trailer

By David Arminas June 18, 2025 Read time: 1 min
In contrast to conventional tipper vehicles, the Thermo push-off trailer enables controlled and even material discharge

 

The biggest challenge in large-scale asphalting projects is maintaining a constant temperature of the mix. This is exactly where Fliegl’s ASW Thermo push-off trailer can help.

In contrast to conventional tipper vehicles, the Thermo push-off trailer enables controlled and even material discharge. This reduces material losses, prevents compaction problems and ensures precise dosing of the asphalt. In addition, the push-off trailer can be unloaded in low halls or under bridges - a clear advantage over tippers.

The focus is not only on efficiency, but also on safety. As the Fliegl ASW Thermo does not tip over, there is no risk of tipping. At the same time, reduced maintenance requirements contribute to a high level of cost-effectiveness. In addition, the reduced CO₂ emissions due to less loss of mix and optimised transport enable a more sustainable construction method.

Its special thermal insulation ensures that the asphalt remains at the optimum processing temperature throughout the entire transport and paving process. Temperature fluctuations, which can lead to reduced adhesion and cracking, are minimised. As a result, the paving quality is significantly improved and the asphalt pavement lasts longer.

 

 

For more information on companies in this article

Related Content

  • Turkish bitumen innovation – from E-MAK
    September 13, 2016
    Turkish firm E-MAK has a reputation for delivering innovative solutions to the industry, with its presence at the bauma exhibition in Munich providing further proof. The firm’s two latest bitumen storage developments could cut costs for plant operators substantially. The new Bi SAS 300 system from E-MAK is intended to cut the cost of bitumen storage by lowering heating bills. According to E-MAK’s chairman, S Nezir Gencer, the operators of most asphalt plants tend to focus on how much fuel the burners used t
  • Infrastructure stays strong on the road to recovery
    July 1, 2021
    After more than a year of uncertainty, the road industry is coming back stronger than ever before thanks to new ways of working and increased investment – because building new infrastructure lays the foundation for a more resilient and economically robust world.
  • Premiere in the Black Forest
    October 5, 2023
    One of the steepest sections of the B 500, an important road in the southern Black Forest, had to be renewed in the summer of 2023 – more precisely: the first kilometres behind the Triberg town sign, past the famous waterfalls. Asphalt paving specialists from Gebrüder Bantle GmbH & Co. KG were commissioned to resurface the carriageway.
  • Rebuilding the busy Frankfurt Airport in Germany
    September 12, 2017
    Handling up to 450 take-offs/day, Runway West is Frankfurt Airport’s busiest runway. Over 50% of the aircraft taking off from the airport uses Runway West, and a point worth noting is that this German airport is one of the busiest in Europe. In 2016, Frankfurt Airport handled nearly 61 million passengers, surpassed by Schiphol in Amsterdam and Charles de Gaulle in Paris, Europe’s third and second busiest airports respectively. Meanwhile London’s Heathrow remained Europe’s busiest airport