Skip to main content

Pumping power for frictional mastic

Innovative Roadway worked with Neal Manufacturing to upgrade the pumps on some of their existing equipment to a more reliable hydraulic piston pump in order to apply frictional mastic course Onyx
November 16, 2020 Read time: 2 mins
Innovative Roadway worked with Neal Manufacturing to upgrade the pumps on some of their existing equipment to a more reliable hydraulic piston pump in order to apply frictional mastic course Onyx

Pavement preservation contractor Innovative Roadway Solutions joined forces with equipment supplier Neal Manufacturing to create a new system for applying Onyx, a frictional mastic surface treatment produced by Ingevity, which has become popular with several Departments of Transport (DoTs) in the US.

The high proportion of aggregate required for Onyx meant that Innovative Roadway Solutions’ usual pumps were not powerful enough and suffered from clogging. “Using Onyx with a traditional pump system results in a lot of unnecessary downtime,” says Kevin King, president of Innovative Roadway Solutions. “Asphalt maintenance has a very limited season — only about seven months in some of the states we work in — so we need to make every minute count.”

As more DoT specifications started to call for Onyx, Innovative Roadway Solutions worked with Neal Manufacturing, part of Blastcrete Equipment, to upgrade their existing equipment with more reliable hydraulic piston pumps.

According to Neal, its heavy-duty aggregate pump (HDP) offers the fastest transfer rate on the market, up to 11.4litres/second with enough pressure to move mixtures with up to 1.2kg of sand/litre. The contractor also bought a new 11,356litre truck from Neal Manufacturing, equipped with the HDP.

Neal Manufacturing also developed a bespoke metering system which allowed Innovative Roadway Solutions to demonstrate that it was meeting the application rates required by the DoT’s specifications. The system combines four load cells at the corners of the tank and a distance measuring device to provide an application rate.

Onyx was introduced in the US in 2012. As well as improving the microtexture of the road surface, the product increases durability and restores the pavement colour to black, improving its appearance and giving safety benefits. Since 2017, Innovative Roadway Solutions has completed 25 contracts where Onyx was specified.

“Onyx bridges the gap between a fog seal and slurry seal, allowing us to offer customers another solution that would extend the life of their road surface without breaking the bank,” said King.

For more information on companies in this article

Related Content

  • Brazilian contractor uses novel methods for high quality road
    January 5, 2015
    Cold-in place recycling method provides fast road rebuild in Brazil In Brazil a road contractor has carried out a high quality road rebuilding job, using novel techniques. Contractor Brown Brown is located in Santa Teresinha in the state of Bahia and recently carried out a two-week job for the company to rehabilitate sections of highway BR-381. The highway is an important route in Brazil and runs from Sao Paulo to Belo Horizonte. Highway BR-381 or Rodovia Fernão Dias, as it is called, stretches some 576km
  • Improving a key route through Florida
    November 9, 2015
    Upgrading a key route through Florida – novel construction techniques are helping widen a road in difficult geological conditions – Lucio Garofalo reports. A major road widening project underway in Florida is due for completion soon. The work will improve an important section of road, reducing congestion at peak period and cutting travel times for drivers. The US 331/SR83 highway runs for some 79km and provides an important link in Florida’s Panhandle area, as it connects with Route 98.
  • Kuwait’s key causeway contract under construction
    July 4, 2016
    A new causeway, crossing the Bay of Kuwait, is under construction and providing a major engineering challenge - Mike Woof reports. The new Sheikh Jaber Al-Ahmad Al-Sabah Causeway Project being built across the Bay of Kuwait is a massive engineering project that is costing around US$3 billion in all. This highly complex project involves the design, build, completion and maintenance of the causeway, which spans Kuwait Bay between Kuwait City and the Subiyah area. The 36km Sheikh Jaber Al-Ahmad Al-Sabah Cau
  • How Hitex changed its products to meet the demands of India’s roads
    December 7, 2016
    The Indian Government is keen to embrace new technologies and ideas from overseas but as Hitex International discovered, Indian roads need very special products - Kristina Smith reports