Skip to main content

Premium ponds

A series of balancing ponds are being used to create a sustainable drainage solution on the Highways Agency’s £375m 28km dual carriageway extension of the A46 in Nottinghamshire. Fearing that a doubling of the surface area of the Newark to Widmerpool trunk road would create excessive high surface water runoff, principal contractor Balfour Beatty and their consultant engineers, URS Scott Wilson, designed 12 balancing ponds, with the outfall from each controlled by Hydro International’s Hydro-Brake Flow Cont
April 25, 2012 Read time: 2 mins
A series of balancing ponds are being used to create a sustainable drainage solution on the 2309 Highways Agency’s £375m 28km dual carriageway extension of the A46 in Nottinghamshire.

Fearing that a doubling of the surface area of the Newark to Widmerpool trunk road would create excessive high surface water runoff, principal contractor 1146 Balfour Beatty and their consultant engineers, URS Scott Wilson, designed 12 balancing ponds, with the outfall from each controlled by 1402 HYDRO International’s Hydro-Brake Flow Control devices.

2759 Environment Agency guidelines require flow restrictions to be held at the predevelopment rate for greenfield runoff, to channel water volumes into local watercourses and control water quality. The A46 also lies adjacent to several environmentally, agriculturally and historically sensitive locations as well as within the flood plains of the Rivers Trent and Devon.

Designed with a permanently wet sump area, the balancing ponds also feature vegetated dry sections to ensure maximum entrapment of debris and silt at most stages of inflow. The outflow of each pond is fitted with a Hydro-Brake Flow Control or chamber, depending on maximum design flow required, from 27.5 to 66 litres/sec.

Work on the A46 upgrade scheme began in 2009, and is due to be completed in summer 2012. It is expected to improve traffic flow and
safety, while by-passing several villages.

For more information on companies in this article

Related Content

  • Getting to the heart of road noise - to eliminate disturbance
    May 20, 2016
    Traffic noise is a widespread nuisance that can impact where and how we choose to live, property prices and our quality of life. Better planning and use of mitigation factors can make a significant difference Traffic is one of the top five sources of nuisance noise – along with industry, construction, sport and leisure and general neighbourhood noise. Road traffic is also one of the most diverse sources of noise. You know where it’s going to come from, but less often what the noise will be as the volu
  • Rubber tyred rollers see key developments
    June 23, 2015
    A series of new rubber tyred asphalt compactors are now coming to market from several key manufacturers - Mike Woof writes Several of the major European compactor manufacturers are introducing new rubber tyred machines to meet demand. Pneumatic tyred rollers are often used for finishing work in road construction, due to the high quality surface they can deliver. For a time development of these machines stalled but in recent years there has been a resurgence of interest in their use. Contractors have reali
  • Scott Wilson acquired
    May 28, 2012
    UK-based engineering firm Scott Wilson has been acquired by the URS Corporation. The size of the deal has not been released at this stage. Scott Wilson is a major engineering firm with an international reputation for its work. The company has carried out a number of key infrastructure engineering projects around the world. With the completion of the Scott Wilson transaction, URS also will add significant international projects outside of the UK, including the Delhi-Mumbai Industrial Corridor Development in
  • Ground penetrating radar used to investigate tunnel deterioration
    May 13, 2015
    Using ground penetrating radar to determine reason for serious pavement settling in Kentucky-Tennessee tunnel Just a few years after the opening of the Cumberland Gap Tunnel, highway officials noticed moderate to severe settling of the continuously reinforced concrete pavement. The mountain tunnel provides an important link between Kentucky and Tennessee along US25E and the problem looked serious, with many voids discovered beneath the pavement surface. To investigate the problems, the Kentucky Transpor