Skip to main content

Premium ponds

A series of balancing ponds are being used to create a sustainable drainage solution on the Highways Agency’s £375m 28km dual carriageway extension of the A46 in Nottinghamshire. Fearing that a doubling of the surface area of the Newark to Widmerpool trunk road would create excessive high surface water runoff, principal contractor Balfour Beatty and their consultant engineers, URS Scott Wilson, designed 12 balancing ponds, with the outfall from each controlled by Hydro International’s Hydro-Brake Flow Cont
April 25, 2012 Read time: 2 mins
A series of balancing ponds are being used to create a sustainable drainage solution on the 2309 Highways Agency’s £375m 28km dual carriageway extension of the A46 in Nottinghamshire.

Fearing that a doubling of the surface area of the Newark to Widmerpool trunk road would create excessive high surface water runoff, principal contractor 1146 Balfour Beatty and their consultant engineers, URS Scott Wilson, designed 12 balancing ponds, with the outfall from each controlled by 1402 HYDRO International’s Hydro-Brake Flow Control devices.

2759 Environment Agency guidelines require flow restrictions to be held at the predevelopment rate for greenfield runoff, to channel water volumes into local watercourses and control water quality. The A46 also lies adjacent to several environmentally, agriculturally and historically sensitive locations as well as within the flood plains of the Rivers Trent and Devon.

Designed with a permanently wet sump area, the balancing ponds also feature vegetated dry sections to ensure maximum entrapment of debris and silt at most stages of inflow. The outflow of each pond is fitted with a Hydro-Brake Flow Control or chamber, depending on maximum design flow required, from 27.5 to 66 litres/sec.

Work on the A46 upgrade scheme began in 2009, and is due to be completed in summer 2012. It is expected to improve traffic flow and
safety, while by-passing several villages.

For more information on companies in this article

Related Content

  • Quieter roads
    July 20, 2012
    Sound absorption systems can cut traffic noise With traffic volumes increasing worldwide and highways having to be redesigned to minimise their impact on the environment, the industry has had to come up with new solutions that reduce the impact of roads. Highway noise is a major issue both in urban and non-urban locations so engineers have been busy developing innovative solutions that can help alleviate this problem. Durability and effective noise dampening properties are claimed for the new All Weather So
  • HP series – strong pneumatic-tyre rollers with many options are performing impressively
    September 15, 2021
    The pneumatic-tyre rollers from the HP series have been on the market across the world for several months and are showing what they can do in practice. This is a completely new generation of pneumatic-tyre rollers, which have been a permanent feature of HAMM's product range since the 1960s. The new HP series model stands out thanks to the large, newly designed water tank. Like the diesel tank, it is generously dimensioned so that the machines have sufficient capacity for a full working day without stopping to refill. For this reason alone, the rollers are already extremely productive
  • ALLU rolls out the D series variable drum and Veloci for North America
    March 17, 2023
    Screening bucket manufacturer ALLU has launched two new products for the North American market, the Veloci and the D Series variable drum.
  • Nepal bridge building receiving funding
    June 4, 2018
    Financing from the World Bank will help pay for bridge building work in Nepal. The road from Muglin to Narayanghat is being widened currently, which will see the route featuring a lane in either direction, rather than the single lane that carries all traffic at present. This will boost its capacity and reduce delays to drivers on the route, which carries around 20,000 vehicles/day. Improving the 36km, north-south route however requires the construction of 18 new bridges. Much of the route is already surface