Skip to main content

Premium ponds

A series of balancing ponds are being used to create a sustainable drainage solution on the Highways Agency’s £375m 28km dual carriageway extension of the A46 in Nottinghamshire. Fearing that a doubling of the surface area of the Newark to Widmerpool trunk road would create excessive high surface water runoff, principal contractor Balfour Beatty and their consultant engineers, URS Scott Wilson, designed 12 balancing ponds, with the outfall from each controlled by Hydro International’s Hydro-Brake Flow Cont
April 25, 2012 Read time: 2 mins
A series of balancing ponds are being used to create a sustainable drainage solution on the 2309 Highways Agency’s £375m 28km dual carriageway extension of the A46 in Nottinghamshire.

Fearing that a doubling of the surface area of the Newark to Widmerpool trunk road would create excessive high surface water runoff, principal contractor 1146 Balfour Beatty and their consultant engineers, URS Scott Wilson, designed 12 balancing ponds, with the outfall from each controlled by 1402 HYDRO International’s Hydro-Brake Flow Control devices.

2759 Environment Agency guidelines require flow restrictions to be held at the predevelopment rate for greenfield runoff, to channel water volumes into local watercourses and control water quality. The A46 also lies adjacent to several environmentally, agriculturally and historically sensitive locations as well as within the flood plains of the Rivers Trent and Devon.

Designed with a permanently wet sump area, the balancing ponds also feature vegetated dry sections to ensure maximum entrapment of debris and silt at most stages of inflow. The outflow of each pond is fitted with a Hydro-Brake Flow Control or chamber, depending on maximum design flow required, from 27.5 to 66 litres/sec.

Work on the A46 upgrade scheme began in 2009, and is due to be completed in summer 2012. It is expected to improve traffic flow and
safety, while by-passing several villages.

For more information on companies in this article

Related Content

  • UK Government finalising plans for Stonehenge road tunnel
    January 12, 2017
    The UK Government is finalising its plans for the construction of a road tunnel close to the famous Stonehenge monument in Wiltshire. The 2.9km tunnel will carry the A303, a busy road that carries heavy traffic, particularly during the holiday season when large numbers of tourists pass through the area. The existing route passes close to the Stonehenge monument but the road is widely recognised as being unfit for purpose. As well as carrying cars, it handles a high percentage of large trucks, including heav
  • Lafarge starts Vancouver YVR runway paving
    May 13, 2025
    Lafarge Canada, part of Holcim, is the paving subcontractor for Vancouver Airport’s North Runway Modernisation Programme in British Columbia.
  • Improving a key route through Florida
    November 9, 2015
    Upgrading a key route through Florida – novel construction techniques are helping widen a road in difficult geological conditions – Lucio Garofalo reports. A major road widening project underway in Florida is due for completion soon. The work will improve an important section of road, reducing congestion at peak period and cutting travel times for drivers. The US 331/SR83 highway runs for some 79km and provides an important link in Florida’s Panhandle area, as it connects with Route 98.
  • Tensar’s route to Euro 2012
    July 20, 2012
    Tensar International’s TriAx design solution has been used in the sub-base for the 17.9km Gdansk bypass in Poland. TriAx is said to be helping to combat the differential settlement across the poor soil of the Wistula river delta and to minimise frost heave caused by Poland’s severe winters. TriAx is said to be helping to combat the differential settlement across the poor soil of the Wistula river delta and to minimise frost heave caused by Poland’s severe winters.