Skip to main content

Premium ponds

A series of balancing ponds are being used to create a sustainable drainage solution on the Highways Agency’s £375m 28km dual carriageway extension of the A46 in Nottinghamshire. Fearing that a doubling of the surface area of the Newark to Widmerpool trunk road would create excessive high surface water runoff, principal contractor Balfour Beatty and their consultant engineers, URS Scott Wilson, designed 12 balancing ponds, with the outfall from each controlled by Hydro International’s Hydro-Brake Flow Cont
April 25, 2012 Read time: 2 mins
A series of balancing ponds are being used to create a sustainable drainage solution on the 2309 Highways Agency’s £375m 28km dual carriageway extension of the A46 in Nottinghamshire.

Fearing that a doubling of the surface area of the Newark to Widmerpool trunk road would create excessive high surface water runoff, principal contractor 1146 Balfour Beatty and their consultant engineers, URS Scott Wilson, designed 12 balancing ponds, with the outfall from each controlled by 1402 HYDRO International’s Hydro-Brake Flow Control devices.

2759 Environment Agency guidelines require flow restrictions to be held at the predevelopment rate for greenfield runoff, to channel water volumes into local watercourses and control water quality. The A46 also lies adjacent to several environmentally, agriculturally and historically sensitive locations as well as within the flood plains of the Rivers Trent and Devon.

Designed with a permanently wet sump area, the balancing ponds also feature vegetated dry sections to ensure maximum entrapment of debris and silt at most stages of inflow. The outflow of each pond is fitted with a Hydro-Brake Flow Control or chamber, depending on maximum design flow required, from 27.5 to 66 litres/sec.

Work on the A46 upgrade scheme began in 2009, and is due to be completed in summer 2012. It is expected to improve traffic flow and
safety, while by-passing several villages.

For more information on companies in this article

Related Content

  • Glasgow's new link opening
    February 28, 2012
    A new highway link is opening today in the Scottish city of Glasgow.
  • Workzones benefit from new mobile speed enforcement technology
    April 10, 2012
    A variety of new technology for temporary speed zones during major highway projects across the globe is about to hit the market, while other proven systems remain in demand. Guy Woodford reports. The D-Cam P is one of four new mobile speed reading products for temporary speed zones being launched this month by Truvelo. Deployable solely as a speed camera or at a red light intersection to monitor red light offences, the D-Cam P can also act as a speed camera on the green and amber light phases. The machine d
  • Effective washing processes are crucial to provide quality materials
    July 1, 2013
    Effective washing processes are crucial to providing quality materials. Materials washing specialist CDE is offering three updated machines, the Evowash, the M2500 and the Agg Max 83R. All three machines have benefitted from improvements compared to previous versions but the Evowash unit features the most changes, including two ideas with patents pending. “We have been evolving the Evowash ever since we invented it 20 years ago, hence its name,” said Iain Walker, technical sales manager for the Middle East.
  • Power and versatile compressors from Doosan
    December 18, 2014
    The line-up now includes a full range of compressed air applications for construction, rental, utilities and quarrying sectors, with free air deliveries from 5-42.5m3/min at output pressures from 7-35bar. As well as a wide selection of Tier 3 High Ambient models, the range also includes several Tier 1 or Tier 2 engine-powered models well suited to the local fuel quality levels. Among the smallest Tier 2 models is the popular C185WKUB-EX-T2 compressor with a compact design, easy towability and transportatio