Skip to main content

Premium ponds

A series of balancing ponds are being used to create a sustainable drainage solution on the Highways Agency’s £375m 28km dual carriageway extension of the A46 in Nottinghamshire. Fearing that a doubling of the surface area of the Newark to Widmerpool trunk road would create excessive high surface water runoff, principal contractor Balfour Beatty and their consultant engineers, URS Scott Wilson, designed 12 balancing ponds, with the outfall from each controlled by Hydro International’s Hydro-Brake Flow Cont
May 3, 2012 Read time: 2 mins
A series of balancing ponds are being used to create a sustainable drainage solution on the 2309 Highways Agency’s £375m 28km dual carriageway extension of the A46 in Nottinghamshire.

Fearing that a doubling of the surface area of the Newark to Widmerpool trunk road would create excessive high surface water runoff, principal contractor 1146 Balfour Beatty and their consultant engineers, URS Scott Wilson, designed 12 balancing ponds, with the outfall from each controlled by 1402 HYDRO International’s Hydro-Brake Flow Control devices.

2759 Environment Agency guidelines require flow restrictions to be held at the predevelopment rate for greenfield runoff, to channel water volumes into local watercourses and control water quality. The A46 also lies adjacent to several environmentally, agriculturally and historically sensitive locations as well as within the flood plains of the Rivers Trent and Devon.

Designed with a permanently wet sump area, the balancing ponds also feature vegetated dry sections to ensure maximum entrapment of debris and silt at most stages of inflow. The outflow of each pond is fitted with a Hydro-Brake Flow Control or chamber, depending on maximum design flow required, from 27.5 to 66 litres/sec.

Work on the A46 upgrade scheme began in 2009, and is due to be completed in summer 2012. It is expected to improve traffic flow and
safety, while by-passing several villages.

For more information on companies in this article

Related Content

  • Modular water treatment solutions
    May 3, 2021
    Siltbuster has provided Costain with four modular treatment solutions, to be used during the delivery of the £200 million Preston Western Distributor Road, linking Preston and southern Fylde to the M55 motorway.
  • Better drainage planning with QuAD software
    April 19, 2021
    The QuAD software resilience tool from ACO Water Management allows users to test the efficiency of a proposed maintenance regime for a roadway water channel design.
  • Clever electric solution for embankment stabilisation
    August 28, 2013
    A highly innovative solution for road embankment stabilisation has helped save costs by up to 30% over conventional techniques. Balfour Beatty Mott MacDonald has used electrical current to stabilise embankments on a busy UK dual carriageway, avoiding disruption to motorists, cutting carbon by 40% and costs by 30%, and producing zero waste When slope failure was detected on embankments carrying the popular A21 dual carriageway, Balfour Beatty Mott MacDonald pioneered a novel technique to tackle the prob
  • Hydro secures UK experts for new global consultancy
    March 1, 2012
    Hydro International is launching a new engineering consultancy for flood risk assessment and stormwater management in the UK and worldwide.