Skip to main content

Premium ponds

A series of balancing ponds are being used to create a sustainable drainage solution on the Highways Agency’s £375m 28km dual carriageway extension of the A46 in Nottinghamshire. Fearing that a doubling of the surface area of the Newark to Widmerpool trunk road would create excessive high surface water runoff, principal contractor Balfour Beatty and their consultant engineers, URS Scott Wilson, designed 12 balancing ponds, with the outfall from each controlled by Hydro International’s Hydro-Brake Flow Cont
May 3, 2012 Read time: 2 mins
A series of balancing ponds are being used to create a sustainable drainage solution on the 2309 Highways Agency’s £375m 28km dual carriageway extension of the A46 in Nottinghamshire.

Fearing that a doubling of the surface area of the Newark to Widmerpool trunk road would create excessive high surface water runoff, principal contractor 1146 Balfour Beatty and their consultant engineers, URS Scott Wilson, designed 12 balancing ponds, with the outfall from each controlled by 1402 HYDRO International’s Hydro-Brake Flow Control devices.

2759 Environment Agency guidelines require flow restrictions to be held at the predevelopment rate for greenfield runoff, to channel water volumes into local watercourses and control water quality. The A46 also lies adjacent to several environmentally, agriculturally and historically sensitive locations as well as within the flood plains of the Rivers Trent and Devon.

Designed with a permanently wet sump area, the balancing ponds also feature vegetated dry sections to ensure maximum entrapment of debris and silt at most stages of inflow. The outflow of each pond is fitted with a Hydro-Brake Flow Control or chamber, depending on maximum design flow required, from 27.5 to 66 litres/sec.

Work on the A46 upgrade scheme began in 2009, and is due to be completed in summer 2012. It is expected to improve traffic flow and
safety, while by-passing several villages.

For more information on companies in this article

Related Content

  • Shrewd construction
    January 2, 2013
    David Williams is director of Kijlstra UK, one of the leading European manufacturers and suppliers of drainage solutions. The Group has a turnover in excess of €150 million and sites in numerous locations throughout Western Europe. Ever since Sir John Egan kick-started the Rethinking Construction movement more than a decade ago, designers, contractors and suppliers have been trying to find ways of improving site safety, cutting waste and generally improving efficiency in the construction process. “There has
  • Success of ICOET 2011 event for sustainable roads
    April 12, 2012
    The ICOET 2011 event proved a success for sustainable transportation – *Leonard Sielecki With over 500 delegates from 21 countries, the recent 2011 International Conference on Ecology and Transportation (ICOET) held in Seattle, Washington, USA proved a success. Organised and co-sponsored by the Center for Transportation and the Environment (CTE) at North Carolina State University, and co-hosted by the Washington State Department of Transportation (WSDoT), the five-day conference ran from August 21st-25th
  • Trials completed on Klaruw's K190
    February 6, 2012
    Northern Ireland's Department for Regional Development Roads Service has completed trials of the Klaruwtex190 (K190) bush hammering process on sections of the A5 south of Londonderry.
  • Road grip from Romaquip
    July 4, 2012
    The latest machines from Romaquip will help keep the UK's roads free from snow and ice in winter conditions. The Highways Agency has boosted it fleet of salt spreaders and snowplough vehicles with the addition of the new Ultima machines from Romaquip. The agency is to purchase some 450 vehicles by 2011 to replace its existing fleet and Romaquip is one of two suppliers taking a share of the four-year contract. The new Ultima vehicles offer more efficient use of salt through a pre-wet application, while also