Skip to main content

Powerful machine control technology

THE TRIMBLE TSC3 handheld controller for construction is said to offer powerful and rugged control capabilities. This hand-held unit is aimed at duties with heavy and highway contractors and features builtin GPS, 3G, Wi-Fi and a 5 megapixel digital camera. The unit is said to allow site workers to stay connected and also provides accurate positioning and digital design information. Using this unit allows engineers to locate, measure and record information anywhere on the construction site with a single devi
February 14, 2012 Read time: 2 mins
THE 2122 Trimble TSC3 handheld controller for construction is said to offer powerful and rugged control capabilities.

This hand-held unit is aimed at duties with heavy and highway contractors and features builtin GPS, 3G, Wi-Fi and a 5 megapixel digital camera.

The unit is said to allow site workers to stay connected and also provides accurate positioning and digital design information. Using this unit allows engineers to locate, measure and record information anywhere on the construction site with a single device. The TSC3 features a large sunlight-readable touch screen display, ruggedised bumpers and long battery life.

The controller is shock, dust and water resistant for durability. The built-in GPS allows the TSC3 controller to be used for standalone navigation and measurement purposes. 2362 Bluetooth and optional radio capabilities allow the controller to be used with Trimble Site Positioning Systems, GNSS or total stations, where the highest accuracy is required. Integrated communications, including Bluetooth, Wi-Fi and a cellular modem, keep data flowing between field instruments and job crews and other stakeholders. The integrated 3G modem also can provide instant access to the Internet for receiving base station corrections as well as emailing files. The 5 megapixel digital camera makes it easy to collect site information and visually record site conditions for documentation and quality control. No extra devices or batteries are required, and images are automatically geo-tagged and associated with measured points for easy identification. Avanced capabilities and communications are incorporated into one handheld device. Engineers can send design changes or work orders to contractors and crews in the field. The contractor can transfer progress reports, on-site problems, and as-built data back to the office on completion of on-site operations. Site issues and completed work can be photographed and sent back to the office overlaid on the site map.

For more information on companies in this article

Related Content

  • Lima's massive $2 billion airport project
    March 4, 2025
    Peru’s capital, Lima, is to benefit from a massive new international airport, which will be one of the largest in Latin America – Mike Woof writes
  • Developments in tolling technology
    February 27, 2012
    Jason Barnes reviews the last few decades and the future of tolling technology. Tolling and charging technology has evolved significantly over the last three decades and that evolution is perhaps best illustrated by reductions in or complete removal of impedances to physical progress. Once, it was customary for a driver to pull up to a barrier, make some form of cash payment to a human operative in a booth, and then wait for the barrier to be raised before proceeding. Humans were eventually complemented and
  • Trimble’s innovative machine control tools
    June 24, 2024
    Trimble is introducing an array of technology solutions for machine control as well as surveying.
  • RoadVista launches StripeMaster 3
    March 1, 2023
    StripeMaster 3 quantifies roadway and airfield pavement marking characteristics including retroreflectivity, daytime visibility and night-time retroreflected colour.