Skip to main content

Portuguese palaeontologists protest

A Portuguese construction contractor has caused dismay amongst archeologists after he dug up some dinosaur bones. The man put the sauropod tail bones, which measure a total 3.6m long, for sale on the Internet causing a flurry of protest from Portuguese palaeontologists. The valuable bones are thought to be from 146-152 million years old. However, the contractor has so far refused an offer of €100,000 from a Portuguese museum and is also refusing to tell palaeontologists where the find was made.
July 6, 2012 Read time: 1 min
A Portuguese construction contractor has caused dismay amongst archeologists after he dug up some dinosaur bones. The man put the sauropod tail bones, which measure a total 3.6m long, for sale on the Internet causing a flurry of protest from Portuguese palaeontologists. The valuable bones are thought to be from 146-152 million years old. However, the contractor has so far refused an offer of €100,000 from a Portuguese museum and is also refusing to tell palaeontologists where the find was made.

Related Content

  • LiuGong unveils biggest wheeled loader at bauma China
    November 13, 2014
    Ahead of bauma China 2014, Aggregates Business International visited the company’s Liuzhou, southwest China HQ, to hear about the company’s bold growth plans and how it’s keenly focused on tailoring its product output to domestic and international market demand - Guy Woodford reports Taking shape on a huge area of land next to the company’s impressive Liuzhou, China HQ, LiuGong’s new R&D centre, set to open in spring 2015, will take the ambitious firm’s product capabilities to an even higher level. Starti
  • LiuGong unveils biggest wheeled loader at bauma China
    January 6, 2017
    Ahead of bauma China 2014, Aggregates Business International visited the company’s Liuzhou, southwest China HQ, to hear about the company’s bold growth plans and how it’s keenly focused on tailoring its product output to domestic and international market demand - Guy Woodford reports Taking shape on a huge area of land next to the company’s impressive Liuzhou, China HQ, LiuGong’s new R&D centre, set to open in spring 2015, will take the ambitious firm’s product capabilities to an even higher level. Starti
  • Implementation of road building projects in Russia’s Moscow may be significantly delayed
    May 15, 2014
    Implementation of some large-scale investment projects for road building in Russia’s capital Moscow may be significantly delayed A series of major documentation issues are the cause of the problem. These have delayed projects for up to nine tenders on the total sum of US$2.6 billion (95 billion rubles), with anomalies having been found by the Russian Federal Anti-Monopoly Service.
  • Tunnelling with Atlas Copco's HPT
    February 6, 2012
    Atlas Copco claims that its high precision tunnelling (HPT) system will offer greater productivity and reduced costs in drill and blast tunnelling operations. The HPT system is a package with five options for use on drill rigs and other types of construction equipment. Advanced PC-based software allows a worksite office to provide operational support to Atlas Copco rigs equipped with the Rig Control System (RCS). The Tunnel Manager system can help plan, store and evaluate data for the drilling process. This