Skip to main content

Portuguese palaeontologists protest

A Portuguese construction contractor has caused dismay amongst archeologists after he dug up some dinosaur bones. The man put the sauropod tail bones, which measure a total 3.6m long, for sale on the Internet causing a flurry of protest from Portuguese palaeontologists. The valuable bones are thought to be from 146-152 million years old. However, the contractor has so far refused an offer of €100,000 from a Portuguese museum and is also refusing to tell palaeontologists where the find was made.
July 6, 2012 Read time: 1 min
A Portuguese construction contractor has caused dismay amongst archeologists after he dug up some dinosaur bones. The man put the sauropod tail bones, which measure a total 3.6m long, for sale on the Internet causing a flurry of protest from Portuguese palaeontologists. The valuable bones are thought to be from 146-152 million years old. However, the contractor has so far refused an offer of €100,000 from a Portuguese museum and is also refusing to tell palaeontologists where the find was made.

Related Content

  • Preparing a raceway with milling machinery
    November 6, 2018
    Contractor Continental Milling has played an important role in refurbishing the famous Pikes Peak Highway route in the US state of Colorado Working as a subcontractor for the Kiewit Corporation on the mill and overlay project, the Continental Milling crew was responsible for milling patches up to 213.4m long on the winding, two-lane highway known for its switchback turns and scenic vistas. The work was needed to prepare the route for the annual Pikes Peak International Hill Climb. Pikes Peak Highway fea
  • Sophisticated machine telematics packages offered
    September 27, 2013
    Several of the major equipment manufacturers now offer sophisticated telematics packages fitted as standard to their machines. Caterpillar and Komatsu were amongst the leaders in this field, allowing a high level of access to a machine's systems and sub-systems for performance monitoring, maintenance management and geofencing purposes for example. To the customer this offers the chance to address fleet running costs and utilisation, reduce the risk of theft and increase overall efficiency. Customers can eve
  • Road repairs take to the air
    November 29, 2018
    Automated road repairs using 3D printing could save money and reduce disruption, reports Kristina Smith It’s the middle of the night and in the street below a team is busy carrying out repairs to the road surface. But there isn’t a human in sight. A road-repair drone has landed at the site of a crack and a 3D asphalt printer is now busy filling in that crack. A group of traffic cone drones have positioned themselves around the repair location to protect the repair drone and divert traffic around it.
  • Brokk offers painless bridge work
    February 10, 2020
    Peter Bigwood* makes the case for using remote-controlled demolition machines to demolish bridge decks