Skip to main content

Portuguese palaeontologists protest

A Portuguese construction contractor has caused dismay amongst archeologists after he dug up some dinosaur bones. The man put the sauropod tail bones, which measure a total 3.6m long, for sale on the Internet causing a flurry of protest from Portuguese palaeontologists. The valuable bones are thought to be from 146-152 million years old. However, the contractor has so far refused an offer of €100,000 from a Portuguese museum and is also refusing to tell palaeontologists where the find was made.
July 6, 2012 Read time: 1 min
A Portuguese construction contractor has caused dismay amongst archeologists after he dug up some dinosaur bones. The man put the sauropod tail bones, which measure a total 3.6m long, for sale on the Internet causing a flurry of protest from Portuguese palaeontologists. The valuable bones are thought to be from 146-152 million years old. However, the contractor has so far refused an offer of €100,000 from a Portuguese museum and is also refusing to tell palaeontologists where the find was made.

Related Content

  • Copy of New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • Advances in rubber tyre machine market
    February 19, 2013
    One market segment where there have been notable developments has been for rubber tyred asphalt rollers. Several models have been introduced, and the Chinese market has played a key role in this respect, with both international and indigenous companies introducing machines. BOMAG’s Chinese factory is not simply building models developed in Europe. This recently expanded facility has its own research and development teams and is developing machines for China, and also for the international market. Emission r
  • Major producer of road construction materials
    February 10, 2012
    The Simge Group operates a massive and highly modern quarrying operation close to the Turkish city of Bursan, which provides a major supply of aggregates and asphalt to the country's highway construction sector. This quarry produces around 4 million tonnes/year of crushed limestone and is the largest of the five quarries the Simge Group runs in Turkey, which have a combined output of 12 million tonnes/year. The huge site has an asphalt output of 500,000tonnes/year, again a significant portion of the 1.2 mil