Skip to main content

Portuguese palaeontologists protest

A Portuguese construction contractor has caused dismay amongst archeologists after he dug up some dinosaur bones. The man put the sauropod tail bones, which measure a total 3.6m long, for sale on the Internet causing a flurry of protest from Portuguese palaeontologists. The valuable bones are thought to be from 146-152 million years old. However, the contractor has so far refused an offer of €100,000 from a Portuguese museum and is also refusing to tell palaeontologists where the find was made.
July 6, 2012 Read time: 1 min
A Portuguese construction contractor has caused dismay amongst archeologists after he dug up some dinosaur bones. The man put the sauropod tail bones, which measure a total 3.6m long, for sale on the Internet causing a flurry of protest from Portuguese palaeontologists. The valuable bones are thought to be from 146-152 million years old. However, the contractor has so far refused an offer of €100,000 from a Portuguese museum and is also refusing to tell palaeontologists where the find was made.

Related Content

  • Low cost lighting
    February 17, 2012
    Chinese firm Foshan is offering a novel new electromagnetic induction lamp system. This combines electronic, magnetic and light source technology. It does not have a filament and the electrode uses electromagnetic induction technology to generate an electromagnetic circuit in the lamp. By not using a traditional filament or electrodes, this avoids wear and is said to offer a long life-span.
  • Malawian city Zomba gets solar street lights
    March 9, 2018
    Zomba has become the first city in Malawi to install solar powered street lights, according to local media. The 261 solar powered street lights are going to cover the city’s boundary along the M3 road for around 7km. City authorities said they have responded to concerns about the possibility of poor lighting from the solar luminaries during the rainy season which can be long with continuous heavy cloud. The move is part of a strategy to reduce dependency on hydropower which is in short supply and can be
  • Choosing the right dowel drilling equipment
    March 16, 2012
    Several aspects factor into choosing the proper concrete dowel drill - Randy Stevens. The concrete paving industry has seen significant changes to dowel drilling equipment over the years. Many years ago only hand-held models existed and when the first hydraulic drills were launched over 30 years ago, these increased production and reduced labour needs. Since that time pneumatic drills, have come to market and these are driven by air compressors, which are common on many worksites while the units also have l
  • Payment for Paraguay bridge project
    May 15, 2020
    A payment has been made for a portion of a Paraguayan bridge project.