Skip to main content

Portuguese palaeontologists protest

A Portuguese construction contractor has caused dismay amongst archeologists after he dug up some dinosaur bones. The man put the sauropod tail bones, which measure a total 3.6m long, for sale on the Internet causing a flurry of protest from Portuguese palaeontologists. The valuable bones are thought to be from 146-152 million years old. However, the contractor has so far refused an offer of €100,000 from a Portuguese museum and is also refusing to tell palaeontologists where the find was made.
July 6, 2012 Read time: 1 min
A Portuguese construction contractor has caused dismay amongst archeologists after he dug up some dinosaur bones. The man put the sauropod tail bones, which measure a total 3.6m long, for sale on the Internet causing a flurry of protest from Portuguese palaeontologists. The valuable bones are thought to be from 146-152 million years old. However, the contractor has so far refused an offer of €100,000 from a Portuguese museum and is also refusing to tell palaeontologists where the find was made.

Related Content

  • Ecuador’s worryingly high fatal crash rate
    June 21, 2013
    Ecuador’s shocking high road fatality rate is giving cause for concern. Official statistics compiled by the World Health Organisation (WHO) suggest that Ecuador is second only to Venezuela in Latin America with regard to fatalities on the road network. The WHO figures show that Ecuador has an average of 28 deaths/100,000 inhabitants from road crashes, well above the global average of 18 deaths/100,000 inhabitants. Only Venezuela’s even more startling figure of 37 deaths/100,000 inhabitants is higher in Lati
  • Race track construction in Japan
    March 13, 2024

    Road construction machines from the Wirtgen Group have been used to build a new race track in Japan. Four Vögele asphalt pavers worked on the project to build a demanding circuit in a mountainous area in Japan.

    Tight corners and uphill gradients of up to 19% are features of the private racing circuit. Three Vögele pavers, a SUPER 1800-3i, a SUPER 1803-3i and a SUPER 1900-2, paved almost 100,000m2 in four layers, while a MT 3000-3i offset material feeder was also used to ensure efficiency and quality.

  • Kenya develops annuity road funding model
    May 8, 2015
    Kenya is introducing novel methods for funding its necessary road infrastructure development - Shem Oirere writes. Kenya has unveiled a new financing model for road construction and reviewed its design standards and construction methodologies, which forms part of a new strategy for the East African country. Under this new plan Kenya is planning to upgrade 10,000km of road, with these links featuring asphalt surfacing; the work being carried out over the next five years at a cost of US$2.8 billion. Despite t
  • TomTom maps cover over 35 million kilometres
    May 4, 2012
    TomTom has announced the availability of its latest map and enhancement product portfolio, delivering new coverage and features. With the addition of 400,000 kilometres across the globe, the company claims its navigable map database is the first to reach 35.2 million kilometres of roads, covering 104 countries and a record 3.4 billion people worldwide.