Skip to main content

Plants for Kazakhstan

CITIC Construction is now using no less than five Lintec CSM4000 asphalt mixing plants for road construction works in Kazakhstan. The Chinese contractor said that these units were selected as they met its needs. The containerised design of the Lintec CSM4000 asphalt plant allows ease of transport, fast installation and also ensures protection for core components.
November 28, 2022 Read time: 3 mins
Asphalt plants from Lintec & Linnhoff are playing a useful role in a road construction contract in Kazakhstan for Chinese firm CITIC

Other factors in the contractor selecting these plants were the reliable German design as well as the Miprotek M4 operating system which allows for partial or full automation of production. The recipe can be specified and changed at any time, or remain perfectly consistent, optimising overall control.

The plants are being used to help construction the 943.4km ‘Bright Path’ project in southeastern Kazakhstan, part of China’s massive Belt and Road Initiative. The new route is significant as it will contribute to making the country the preferred cross-continental transit hub in Central Asia. The plants are also being used to assist with materials for other major road rehabilitation projects the firm is carrying out in southeastern Kazakhstan.

As a crucial part of Kazakhstan’s ‘Bright Path’ project, the road improvement scheme covers the 180km Usharal-Dostyk (A7 Highway) port road in the Almaty region. This is in addition to the 763.4km Taldykorgan~Ust-Kamenogorsk (A3 Highway) section in the nearby, newly created Zhetysu region. The A7 Highway will be constructed to Kazakhstan II road standards, with a roadbed width of 15m providing two lanes for two-way traffic, while 53.445km of the A3 Highway is expected to adopt the Kazakhstan I-b road standard, with a 25.5m roadbed width catering for four lanes of two-way travel.

With a total length of 943.4km including alterations and new sections, the new highways will allow for designated speeds of up to 120km/h. This would provide an important gateway for connectivity between China, Kazakhstan and surrounding countries when the job is completed in 2023.

Transporting these large asphalt plants to the jobsites was the first hurdle to overcome. It was however made much easier thanks to their main modules being conveniently built within ISO certified shipping containers.

As a result, when the first two plants were shipped out to the Taldykorgan-Ust-Kamenogorsk and Usharal-Dostyk road improvement project 8, Lintec could send the plants by rail. With its trademark yellow containers, the train left the Lintec factory near Shanghai, China, heading towards the customer in the landlocked Central Asian nation, a great improvement from the traditional road freight or sea transit methods.

The Lintec team also customised the containers with a variety of protective measures for the journey, such as secure packaging, ensuring the equipment’s safety and eliminating the risk of theft or vandalism. Once the containers were unloaded, their modular construction made installation quick and convenient.

Another key benefit for installation was the fact that the containerised design means there is no need for concrete foundations. The flat, rigid surface area ensures high stability on suitably compacted soil. As the units have been tested in the plant prior to shipping, they can be commissioned very speedily.

In addition, the containerised design concept also provided each plant with protection from the harsh elements of the windswept Kazakh terrain.

The same protective structure also provides security advantages, with a single, lockable, access point in the design. Once access is granted, the walkways and staircases provide maintenance access to all levels. As the second largest capacity model of the range, the CSM4000 has an output of 320tonnes/hour of hot mix asphalt, in batch sizes of 4tonnes.

For more information on companies in this article

Related Content

  • Russia’s trans-continental route
    August 10, 2018
    Russia is spending US$10 billion on building a 2,000km section of road connecting China with the EU – Eugene Gerden reports Russia has now started building a 2,000km section of a new transcontinental route, which will connect China and the EU. According to senior officials from the Russian Ministry of Transport, which is implementing the project, the new road, will be known as the Meridian and will stretch through the Russian territory that borders with Kazakhstan and Belarus. This route forms the Russian
  • G&Z pave the way as East meets West
    March 28, 2014
    The Silk Route is one of the oldest trading links between Europe and Asia and is being upgraded with some of the newest equipment. The nation of Georgia is located on what is known as the ‘crossroads’ between Western Asia and Eastern Europe. It lies to the east of the Black Sea and is on one of the shortest routes between western China and Europe. Since the Middle Ages this strategically important country has played host to one of the network of roads collectively known as the Silk Route. For much of the 20
  • The world’s longest suspension bridge
    June 24, 2024
    The world’s longest suspension bridge is the 1915 Çanakkale Bridge in Turkey. This engineering marvel links Gelibolu with Lapseki, forming a key section of the 101km highway linking Malkara with Çanakkale. *Article produced in partnership with the General Directorate of Highways (KGM), Ministry of Transport and Infrastructure, Republic of Türkiye.
  • Lintec’s CSM 2500 plant offers low transport costs and quick assembly and disassembly
    February 12, 2013
    Lintec’s new CSM 2500 asphalt mixing plant with parallel drum and conventional screening machine will be on show at bauma. The parallel drum on the plant can be used for hot and cold recycling. Capable of producing 160tonnes/hour, the fully containerised configuration of the CSM 2500 is said by its German manufacturer to ensure lower transport costs and quick and efficient assembly and disassembly. The plant has six screening decks, a 60tonne capacity hot stone bin, a 45tonne reclaimed filler silo, produces