Skip to main content

Plants for Kazakhstan

CITIC Construction is now using no less than five Lintec CSM4000 asphalt mixing plants for road construction works in Kazakhstan. The Chinese contractor said that these units were selected as they met its needs. The containerised design of the Lintec CSM4000 asphalt plant allows ease of transport, fast installation and also ensures protection for core components.
November 28, 2022 Read time: 3 mins
Asphalt plants from Lintec & Linnhoff are playing a useful role in a road construction contract in Kazakhstan for Chinese firm CITIC

Other factors in the contractor selecting these plants were the reliable German design as well as the Miprotek M4 operating system which allows for partial or full automation of production. The recipe can be specified and changed at any time, or remain perfectly consistent, optimising overall control.

The plants are being used to help construction the 943.4km ‘Bright Path’ project in southeastern Kazakhstan, part of China’s massive Belt and Road Initiative. The new route is significant as it will contribute to making the country the preferred cross-continental transit hub in Central Asia. The plants are also being used to assist with materials for other major road rehabilitation projects the firm is carrying out in southeastern Kazakhstan.

As a crucial part of Kazakhstan’s ‘Bright Path’ project, the road improvement scheme covers the 180km Usharal-Dostyk (A7 Highway) port road in the Almaty region. This is in addition to the 763.4km Taldykorgan~Ust-Kamenogorsk (A3 Highway) section in the nearby, newly created Zhetysu region. The A7 Highway will be constructed to Kazakhstan II road standards, with a roadbed width of 15m providing two lanes for two-way traffic, while 53.445km of the A3 Highway is expected to adopt the Kazakhstan I-b road standard, with a 25.5m roadbed width catering for four lanes of two-way travel.

With a total length of 943.4km including alterations and new sections, the new highways will allow for designated speeds of up to 120km/h. This would provide an important gateway for connectivity between China, Kazakhstan and surrounding countries when the job is completed in 2023.

Transporting these large asphalt plants to the jobsites was the first hurdle to overcome. It was however made much easier thanks to their main modules being conveniently built within ISO certified shipping containers.

As a result, when the first two plants were shipped out to the Taldykorgan-Ust-Kamenogorsk and Usharal-Dostyk road improvement project 8, Lintec could send the plants by rail. With its trademark yellow containers, the train left the Lintec factory near Shanghai, China, heading towards the customer in the landlocked Central Asian nation, a great improvement from the traditional road freight or sea transit methods.

The Lintec team also customised the containers with a variety of protective measures for the journey, such as secure packaging, ensuring the equipment’s safety and eliminating the risk of theft or vandalism. Once the containers were unloaded, their modular construction made installation quick and convenient.

Another key benefit for installation was the fact that the containerised design means there is no need for concrete foundations. The flat, rigid surface area ensures high stability on suitably compacted soil. As the units have been tested in the plant prior to shipping, they can be commissioned very speedily.

In addition, the containerised design concept also provided each plant with protection from the harsh elements of the windswept Kazakh terrain.

The same protective structure also provides security advantages, with a single, lockable, access point in the design. Once access is granted, the walkways and staircases provide maintenance access to all levels. As the second largest capacity model of the range, the CSM4000 has an output of 320tonnes/hour of hot mix asphalt, in batch sizes of 4tonnes.

For more information on companies in this article

Related Content

  • Innovating sustainability: The amo/Debus Gruppe and the high-tech asphalt plant in Hof, Germany
    July 29, 2025
    Founded in 1946 and headquartered in Untersiemau near Coburg, Germany, the amo/Debus Gruppe has grown into a leading force in the building materials and construction logistics industry. With more than 20 locations strategically spread across Northern Bavaria, Thuringia, and Saxony, the company has firmly established itself as a reliable partner in infrastructure development and sustainable construction.
  • Boost for Romania’s road spending
    December 19, 2022
    A big boost for is being seen for Romania’s road spending.
  • JCB boosts compact equipment security
    November 30, 2012
    JCB claim to have taken a big step to protect its smallest plant by announcing all JCB mini and midi excavators sold in the UK now feature its 3-star Thatcham-approved immobiliser as standard. With over €1.24 million [£1 million] worth of plant stolen every week across the UK and Ireland - and just 5% ever recovered, the construction machine industry giant believes the move will protect thousands more machines against theft, while also reducing insurance premiums by up to 45%. The 801 mini excavators were t
  • Transylvania Motorway: route to prosperity
    July 4, 2012
    Work is progressing apace on the biggest infrastructure project in Europe, the Transylvania Motorway or Autostrada Transilvania (A3) in Romania, with completion scheduled for 2013. The four-lane, 415km motorway, stretching northwest from Brasov in central Romania, at an altitude of nearly 600m, will reach the country's northwestern border with Hungary at Oradea in Câmpia Crisanei at 130m above sea level, and will connect the cities of Brasov, Fagaras, Sighisoara, Târgu Mures, Cluj-Napoca, Zalau and Oradea.