Skip to main content

Plants for Kazakhstan

CITIC Construction is now using no less than five Lintec CSM4000 asphalt mixing plants for road construction works in Kazakhstan. The Chinese contractor said that these units were selected as they met its needs. The containerised design of the Lintec CSM4000 asphalt plant allows ease of transport, fast installation and also ensures protection for core components.
November 28, 2022 Read time: 3 mins
Asphalt plants from Lintec & Linnhoff are playing a useful role in a road construction contract in Kazakhstan for Chinese firm CITIC

Other factors in the contractor selecting these plants were the reliable German design as well as the Miprotek M4 operating system which allows for partial or full automation of production. The recipe can be specified and changed at any time, or remain perfectly consistent, optimising overall control.

The plants are being used to help construction the 943.4km ‘Bright Path’ project in southeastern Kazakhstan, part of China’s massive Belt and Road Initiative. The new route is significant as it will contribute to making the country the preferred cross-continental transit hub in Central Asia. The plants are also being used to assist with materials for other major road rehabilitation projects the firm is carrying out in southeastern Kazakhstan.

As a crucial part of Kazakhstan’s ‘Bright Path’ project, the road improvement scheme covers the 180km Usharal-Dostyk (A7 Highway) port road in the Almaty region. This is in addition to the 763.4km Taldykorgan~Ust-Kamenogorsk (A3 Highway) section in the nearby, newly created Zhetysu region. The A7 Highway will be constructed to Kazakhstan II road standards, with a roadbed width of 15m providing two lanes for two-way traffic, while 53.445km of the A3 Highway is expected to adopt the Kazakhstan I-b road standard, with a 25.5m roadbed width catering for four lanes of two-way travel.

With a total length of 943.4km including alterations and new sections, the new highways will allow for designated speeds of up to 120km/h. This would provide an important gateway for connectivity between China, Kazakhstan and surrounding countries when the job is completed in 2023.

Transporting these large asphalt plants to the jobsites was the first hurdle to overcome. It was however made much easier thanks to their main modules being conveniently built within ISO certified shipping containers.

As a result, when the first two plants were shipped out to the Taldykorgan-Ust-Kamenogorsk and Usharal-Dostyk road improvement project 8, Lintec could send the plants by rail. With its trademark yellow containers, the train left the Lintec factory near Shanghai, China, heading towards the customer in the landlocked Central Asian nation, a great improvement from the traditional road freight or sea transit methods.

The Lintec team also customised the containers with a variety of protective measures for the journey, such as secure packaging, ensuring the equipment’s safety and eliminating the risk of theft or vandalism. Once the containers were unloaded, their modular construction made installation quick and convenient.

Another key benefit for installation was the fact that the containerised design means there is no need for concrete foundations. The flat, rigid surface area ensures high stability on suitably compacted soil. As the units have been tested in the plant prior to shipping, they can be commissioned very speedily.

In addition, the containerised design concept also provided each plant with protection from the harsh elements of the windswept Kazakh terrain.

The same protective structure also provides security advantages, with a single, lockable, access point in the design. Once access is granted, the walkways and staircases provide maintenance access to all levels. As the second largest capacity model of the range, the CSM4000 has an output of 320tonnes/hour of hot mix asphalt, in batch sizes of 4tonnes.

For more information on companies in this article

Related Content

  • Tricky mountain road rebuild job in Phoenix AZ
    June 16, 2021
    North Mountain in Phoenix, Arizona is one of the metropolitan area’s most recognisable landmarks and busiest hiking destinations.
  • Intrakat lands on its feet with the Ammann’s ABT QuickBatch plant
    December 13, 2018
    Greek construction company Intrakat likes a challenge. It recently took on two closely scheduled airport projects – but it had only a single asphalt plant. Intrakat used the transport-optimised Ammann ABT QuickBatch Asphalt-Mixing Plant to produce mix at the airport on the island of Mykonos airport. Afterwards, the plant was packed and ferried to Kos. The upgraded runways at Mykonos and Kos are two of the 14 Greek airports being rehabilitated within seven months. Intrakat is handling mix production at
  • Contracts are about to be signed for the Fehmarnbelt Fixed Link
    March 13, 2015
    Nearly eight years after Denmark and Germany agreed to construct a major undersea road and rail tunnel, the first contracts are about to be signed. David Arminas reports. Construction is due to start later this year on one of Europe’s most ambitious, as well as the world’s longest, road and rail tunnels, the 17.6km Fehmarnbelt Fixed Link between Germany and Denmark. Fehmarnbelt is expected to cost around US$7.5 billion and be five times the length of the Øresund tunnel between the Danish capital Copenhagen
  • Contracts are about to be signed for the Fehmarnbelt Fixed Link
    March 13, 2015
    Nearly eight years after Denmark and Germany agreed to construct a major undersea road and rail tunnel, the first contracts are about to be signed. David Arminas reports. Construction is due to start later this year on one of Europe’s most ambitious, as well as the world’s longest, road and rail tunnels, the 17.6km Fehmarnbelt Fixed Link between Germany and Denmark. Fehmarnbelt is expected to cost around US$7.5 billion and be five times the length of the Øresund tunnel between the Danish capital Copenhagen