Skip to main content

Pixie dust on the road?

In Iceland, work on a road construction project was halted over fears that this would cause upset to the elves present in the area. The local council stepped in as work got underway, showing concern that the road building activity would scare away the elves and bring poor fortune to the region. A firm decision was taken, to stop the road building and leave the elves in peace. Trolls however commented adversely on the internet on the grounds for the decision.
May 14, 2014 Read time: 1 min
In Iceland, work on a road construction project was halted over fears that this would cause upset to the elves present in the area. The local council stepped in as work got underway, showing concern that the road building activity would scare away the elves and bring poor fortune to the region. A firm decision was taken, to stop the road building and leave the elves in peace. Trolls however commented adversely on the internet on the grounds for the decision.

Related Content

  • PPRS in Nice: strategic but adaptable maintenance is essential
    March 26, 2018
    “The world is changing, mobility is changing and so roads must change and adapt for the future.” With this brief statement, Jacques Tavernier opened the second Pavement Preservation and Recycling Summit today. “At the same time there is a growing awareness of poor or non-existent maintenance for highways. The question for this conference is how to adapt road maintenance in the face of this challenge,” said Tavernier, addressing the opening plenary session. More than 100 speakers will present their latest
  • Romania sets aside €1.42 billion for local roads
    July 23, 2021
    Prime minister Florin Cîţu has had discussions with European Commission President Ursula von der Leyen to fund the country's proposed National Recovery and Resilience Plan, NRRP.
  • London’s Westminster Council goes for gully offenders
    February 8, 2018
    Increasing numbers of blocked road drains and gullies has forced London’s Westminster City Council to take a tough stand with offenders The council maintains 16,500 gullies. Around 95% of a gully’s content is natural and can be recycled: taken away to road contractor FM Conway’s drainage treatment plant. Material is separated into solids, organics and water and reused as aggregates and materials in their wider construction business.
  • INTERMAT in Asia with ASEAN show
    July 25, 2016
    INTERMAT is developing its presence on the international market with its new INTERMAT ASEAN event. The INTERMAT international trade show for construction machinery is working with IMPACT, a Thai trade show organiser, to establish the new INTERMAT show for the whole ASEAN region. The first edition will take place in Bangkok, from 8th to 10th of June 2017. The ASEAN area is one of the world's fastest growing regions and the development of the infrastructure network is essential for the advancement of ASEA