Skip to main content

Pixie dust on the road?

In Iceland, work on a road construction project was halted over fears that this would cause upset to the elves present in the area. The local council stepped in as work got underway, showing concern that the road building activity would scare away the elves and bring poor fortune to the region. A firm decision was taken, to stop the road building and leave the elves in peace. Trolls however commented adversely on the internet on the grounds for the decision.
May 14, 2014 Read time: 1 min
In Iceland, work on a road construction project was halted over fears that this would cause upset to the elves present in the area. The local council stepped in as work got underway, showing concern that the road building activity would scare away the elves and bring poor fortune to the region. A firm decision was taken, to stop the road building and leave the elves in peace. Trolls however commented adversely on the internet on the grounds for the decision.

Related Content

  • Volvo CE’s arduous Andes assignment
    August 20, 2013
    Volvo Construction Equipment is working in some of the world’s most treacherous terrain to construct a high-speed road link across the Andes Mountains. A fleet of 60 Volvo Construction Equipment (Volvo CE) road-building machines is being used to construct a 140km highway across the Andes Mountains, from Bucaramanga, Colombia’s eighth largest city, to Cucuta on the border – providing the country with a much-needed high-speed link with Venezuela. Tasked with this huge undertaking is innovative Colombian highw
  • Volvo CE’s arduous Andes assignment
    August 20, 2013
    Volvo Construction Equipment is working in some of the world’s most treacherous terrain to construct a high-speed road link across the Andes Mountains. A fleet of 60 Volvo Construction Equipment (Volvo CE) road-building machines is being used to construct a 140km highway across the Andes Mountains, from Bucaramanga, Colombia’s eighth largest city, to Cucuta on the border – providing the country with a much-needed high-speed link with Venezuela. Tasked with this huge undertaking is innovative Colombian highw
  • Tunnelling technology award for Herrenknecht 
    October 26, 2022
    Herrenknecht has received the bauma Innovation Award 2022 in the Machine Technology category, for a new development in continuous tunnelling.
  • Efficient earthmoving builds new road links
    February 7, 2012
    Efficient earthmoving is allowing productive road construction in the Egyptian desert, Mike Woof reports. Despite ferocious desert temperatures, efficient earthmoving operations will help build new road links in Southern Egypt. Close to the Egyptian city of Assuit, the contractor Orascom is working on three key desert highway projects that will provide vital transport connections for the country's growing economy.