Skip to main content

Pilosio flies high with Flydeck

The Flydeck system from Pilosio simplifies and speeds up the assembly of suspended scaffolding and structures more safely.Importantly, because it is an under-bridge suspended system, there is no need to stop bridge traffic or close lanes. The system consists of 25cm or 45cm aluminium or steel lattice girders connected by patented pins and spring pins.
January 17, 2023 Read time: 1 min

 

The girders are installed using the Flyrail rail. The cantilevered girders of the Flydeck surface are supported by the Flyrail rail, while the operator arranges the surface and anchors it in full safety.Loading capacity is up to 150kg/m² with tie-rods every 6m² and loading capacity up to 300kg/m² with tie-rods every 4m². The result is a perfectly horizontal plane for workers in any situation where a suspended solution is needed.

Furthermore, with the use of the Flyrail beam for mounting the Flydeck table, work can be undertaken without difficulty and in complete safety. With this solution, Pilosia says that pillars and pier-caps can be encircled and continued in the next span.

Importantly, there is no limitation in width, length or load capacity. The system is modular and uses beams and scaffolding decks of any make, model, shape and size.

For more information on companies in this article

Related Content

  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b
  • Bridge engineering worldwide
    July 1, 2013
    Guy Woodford looks at vital bridge construction, repair and inspection projects in China, Europe, North America and Australia The Heron Road Bridge in Ottawa, Ontario in Canada is a vital link within the City’s transport network, as it crosses the Rideau River, which divides the east and west parts of the City. Constructed in 1966-1967, the Heron Road Bridge is approximately 275m long and includes six lanes.