Skip to main content

Pilosio builds up its formwork offering with the flying table ST80

Pilosio’s new flying table ST80 is ideal for high construction work where pouring cycles repeat from one level to another. Flying forms are constituted by large sections of formwork, featuring supporting trusses, joists and aluminum posts. This system is used to cast slab areas with tables that can be designed in order to reach up to lengths of 30m and widths of 6m. The system enhances also side flaps in order to handle spaces between columns and slab edges.
January 6, 2017 Read time: 2 mins
Flying table ST80: ideal for high construction work
7163 Pilosio’s new flying table ST80 is ideal for high construction work where pouring cycles repeat from one level to another. Flying forms are constituted by large sections of formwork, featuring supporting trusses, joists and aluminum posts. This system is used to cast slab areas with tables that can be designed in order to reach up to lengths of 30m and widths of 6m. The system enhances also side flaps in order to handle spaces between columns and slab edges.

The company’s new climbing bracket 240 allows a wide range of flexibility according to building geometries. A suspension shoe allows easy connection of the bracket to a concrete wall and the bracket it tiltable. It is designed to erect formwork with heights up to 5.5m. The carriage can slide back of 75cm to ensure enough space to install concrete rebars and clean formwork surface.

Typical applications of this bracket are construction sites that require working platforms to support double-sided panel formwork. The formwork is firmly connected to the supporting bracket and the whole assembly can be lifted together as a unit with cranes. The system consists of the climbing bracket itself, the wall strut, the lower bridge and guard rails. This supporting bracket is fully compatible with all vertical formwork systems supplied by Pilosio, both steel framed formwork panels and MAXIMIX system.

Accompanying all this is Pilosio’s latest aluminum prop, the Slabprop 2.0. Improvements, when compared to the old version, include a greater range of extraction, from 145cm-625cm. It has greater capacity with values up to 76kN - certified according to EN 16031. Also, connection to truss frames is permitted all along the prop, in order to assemble load-bearing towers with high capacity. The new SLABPROP 2.0 is totally compatible with Slabform and Liteform panel systems.

For more information on companies in this article

Related Content

  • Industry AMS opts for safety in any direction
    January 25, 2017
    Italian company AMS explains how its crashworthy end terminals act like a crash cushion Industry AMS (Automation Manufacturing Services) has developed a crashworthy end terminal tested according to part 7 of the EN 1317 that is classified as a double-sided and bi-directional end terminal. Starting from the European version of the terminal, and based on the same architecture, AMS has designed the SMA (Safety Modular Absorber) as a reinforced end-terminal in order to be complaint with both the MASH and
  • Concrete plant innovations coming to market
    December 12, 2022
    An array of advanced technologies are now coming to market for the concrete plant segment. Manufacturers are developing new systems that offer rewards in output quality and productivity, while also benefiting from sophisticated systems that allow gains in material logistics
  • New concrete paving equipment
    May 22, 2023
    The major players in the concrete slipforming market are offering an array of new and improved technologies for users
  • Advanced method for South Africa bridge construction
    May 16, 2016
    A sophisticated construction method has been used for the first time in South Africa for a suspended bridge project This novel method of bridge construction was used on a major road upgrade project for the South African National Roads Agency Limited (SANRAL). Main contractor Lonerock Construction, and subcontractor Tzandeboo Construction, used RMD Kwikform’s Megatruss system to construct a 60m-long bridge while suspended mid-air over the live N4 highway. Lonerock Construction’s US$8.5 million (R132