Skip to main content

Pilosio builds up its formwork offering with the flying table ST80

Pilosio’s new flying table ST80 is ideal for high construction work where pouring cycles repeat from one level to another. Flying forms are constituted by large sections of formwork, featuring supporting trusses, joists and aluminum posts. This system is used to cast slab areas with tables that can be designed in order to reach up to lengths of 30m and widths of 6m. The system enhances also side flaps in order to handle spaces between columns and slab edges.
January 6, 2017 Read time: 2 mins
Flying table ST80: ideal for high construction work
7163 Pilosio’s new flying table ST80 is ideal for high construction work where pouring cycles repeat from one level to another. Flying forms are constituted by large sections of formwork, featuring supporting trusses, joists and aluminum posts. This system is used to cast slab areas with tables that can be designed in order to reach up to lengths of 30m and widths of 6m. The system enhances also side flaps in order to handle spaces between columns and slab edges.

The company’s new climbing bracket 240 allows a wide range of flexibility according to building geometries. A suspension shoe allows easy connection of the bracket to a concrete wall and the bracket it tiltable. It is designed to erect formwork with heights up to 5.5m. The carriage can slide back of 75cm to ensure enough space to install concrete rebars and clean formwork surface.

Typical applications of this bracket are construction sites that require working platforms to support double-sided panel formwork. The formwork is firmly connected to the supporting bracket and the whole assembly can be lifted together as a unit with cranes. The system consists of the climbing bracket itself, the wall strut, the lower bridge and guard rails. This supporting bracket is fully compatible with all vertical formwork systems supplied by Pilosio, both steel framed formwork panels and MAXIMIX system.

Accompanying all this is Pilosio’s latest aluminum prop, the Slabprop 2.0. Improvements, when compared to the old version, include a greater range of extraction, from 145cm-625cm. It has greater capacity with values up to 76kN - certified according to EN 16031. Also, connection to truss frames is permitted all along the prop, in order to assemble load-bearing towers with high capacity. The new SLABPROP 2.0 is totally compatible with Slabform and Liteform panel systems.

For more information on companies in this article

Related Content

  • Chicago Pneumatic’s new concrete stars
    May 14, 2014
    Chicago Pneumatic (CP) has unveiled its comprehensive new concrete equipment range. In applications from walls to floor slabs, the range has products to cover every step of the job, from vibration and levelling to finishing and cutting. Freshly poured concrete has air voids which must be removed by vibration to increase its density and finished strength. Depending on the concrete’s depth and slump, this can be achieved using a poker or screed. Customers can now choose mechanical, electric or pneumatic p
  • Chicago Pneumatic’s new concrete stars
    May 14, 2014
    Chicago Pneumatic (CP) has unveiled its comprehensive new concrete equipment range. In applications from walls to floor slabs, the range has products to cover every step of the job, from vibration and levelling to finishing and cutting. Freshly poured concrete has air voids which must be removed by vibration to increase its density and finished strength. Depending on the concrete’s depth and slump, this can be achieved using a poker or screed. Customers can now choose mechanical, electric or pneumatic p
  • Doka delivers on the Nawaseeb Road
    June 29, 2021
    The Nawaseeb Road in Kuwait forms an important part of the country's national infrastructure, providing a strategic, logistical corridor to neighbouring Saudi Arabia
  • Mexico viaduct complete with ULMA formwork
    February 9, 2018
    ULMA developed a comprehensive solution for the construction project of the Interlomas Viaduct, México. Forming part of Mexico City’s transportation infrastructure development plan, this viaduct is 227m long and connects the residential and commercial area Interlomas with the Naucalpan-Toluca highway. ULMA designed a solution fully tailored to meet the pace and needs of the client: gantry falsework for two 59m outer spans, and a CVS Form Carrier for the central span of 108m. ULMA’s engineering team combi