Peri’s MAXIMO Wall Formwork gets MXK bracket enhancements

Peri’s MAXIMO system, with its single-sided tie technology, is very much the centre for wall formwork operations. MAXIMO is the most efficient of the PERI formwork systems and has set a standard in the market for application diversity as well as a particularly high level of safety. The new MAXIMO MXK Bracket System provides maximum safety with minimum installation effort and serves as a working platform for the MAXIMO and TRIO Panel Formworks. In contrast to conventional solutions, the modular system
January 6, 2017 Read time: 2 mins
Max safety for Peri’s MAXIMO system
298 Peri’s MAXIMO system, with its single-sided tie technology, is very much the centre for wall formwork operations.

MAXIMO is the most efficient of the PERI formwork systems and has set a standard in the market for application diversity as well as a particularly high level of safety.

The new MAXIMO MXK Bracket System provides maximum safety with minimum installation effort and serves as a working platform for the MAXIMO and TRIO Panel Formworks. In contrast to conventional solutions, the modular system provides pre-assembled individual components such as the MXK Scaffold Deck or the PROKIT PMB Side Mesh Barrier. These lightweight and manually assembled system components ensure safe and ergonomic work operations.

In addition, new in the MAXIMO standard programme are panels with heights of 3m and 3.6m respectively.

For colder climates, PERI has developed the MXH Formwork System which can be heated whereby the MAXIMO Wall Formwork System is combined with heating elements. This means that concreting operations can also take place at low temperatures as the hydration process is not affected.

Assembly of the panel formwork and heating elements is carried out horizontally. Only two mounting bolts are required on the four frame corners each time. The standard height of the heating elements is 2.70m with standard widths of 2.4m and 1.2m. Corresponding extension elements and practical details such as suitable box outs for the BFD Couplers as well as for connecting the bracket system ensure efficient application of the system.

MAXIMO thus provides a further enhanced range of applications in the area of panel formwork with single-sided operations.

For more information on companies in this article

Related Content

  • Peri has Polish bridge covered
    February 6, 2012
    A new bridge is being constructed across the Vistula River near Grudzi?dz, Poland, and for the foreland bridge from south-east direction, a so-called incremental launching method is being used. Two lanes, each some 556m long, are being constructed in 25 concreting cycles with standard lengths of 24m, while the formwork is 25m long and is positioned behind the bridge abutments.
  • Peri premiere’s PROKIT EP 110 at INTERMAT 2012
    January 6, 2017
    Peri is unveiling its new safety system for building shells at INTERMAT 2012. The PROKIT EP 110 is 1.10m high, quickly mounted temporary protection for open slab edges on building shells.
  • Peri premiere’s PROKIT EP 110 at INTERMAT 2012
    February 3, 2012
    Peri is unveiling its new safety system for building shells at INTERMAT 2012. The PROKIT EP 110 is 1.10m high, quickly mounted temporary protection for open slab edges on building shells.
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b