Peri’s MAXIMO Wall Formwork gets MXK bracket enhancements

Peri’s MAXIMO system, with its single-sided tie technology, is very much the centre for wall formwork operations. MAXIMO is the most efficient of the PERI formwork systems and has set a standard in the market for application diversity as well as a particularly high level of safety. The new MAXIMO MXK Bracket System provides maximum safety with minimum installation effort and serves as a working platform for the MAXIMO and TRIO Panel Formworks. In contrast to conventional solutions, the modular system
January 6, 2017 Read time: 2 mins
Max safety for Peri’s MAXIMO system
298 Peri’s MAXIMO system, with its single-sided tie technology, is very much the centre for wall formwork operations.

MAXIMO is the most efficient of the PERI formwork systems and has set a standard in the market for application diversity as well as a particularly high level of safety.

The new MAXIMO MXK Bracket System provides maximum safety with minimum installation effort and serves as a working platform for the MAXIMO and TRIO Panel Formworks. In contrast to conventional solutions, the modular system provides pre-assembled individual components such as the MXK Scaffold Deck or the PROKIT PMB Side Mesh Barrier. These lightweight and manually assembled system components ensure safe and ergonomic work operations.

In addition, new in the MAXIMO standard programme are panels with heights of 3m and 3.6m respectively.

For colder climates, PERI has developed the MXH Formwork System which can be heated whereby the MAXIMO Wall Formwork System is combined with heating elements. This means that concreting operations can also take place at low temperatures as the hydration process is not affected.

Assembly of the panel formwork and heating elements is carried out horizontally. Only two mounting bolts are required on the four frame corners each time. The standard height of the heating elements is 2.70m with standard widths of 2.4m and 1.2m. Corresponding extension elements and practical details such as suitable box outs for the BFD Couplers as well as for connecting the bracket system ensure efficient application of the system.

MAXIMO thus provides a further enhanced range of applications in the area of panel formwork with single-sided operations.

For more information on companies in this article

Related Content

  • PERI’s balancing act at the Harpe Bru Bridge in Norway
    May 24, 2016
    Plans for the European Route E6 expansion in Norway include the 320m-long Harpe Bru Bridge over the Gudbrandsdalen Lågen River, at Sør-Fron in Oppland province. For the superstructure, PERI civil engineering technology experts developed a balanced cantilevered solution based on the VARIOKIT Engineering Construction Kit. Statens vegvesen, Norway’s agency for public road building, selected an extradosed cable-stayed bridge design – the first such bridge in Norway. It combines the load-bearing behaviour
  • New bridge for old Russian city
    July 30, 2012
    Murom, one of Russia's best preserved old cities, is situated in the European part of the country, around 300km to the east of Moscow. The most important industry and economic activities are mechanical engineering along with timber and textiles. The location on the River Oka, a tributary of the Volga and thus an important waterway, as well as the good connections to important main roads and rail routes, are positive economic factors. It is near Murom that German formwork and scaffolding specialist PERI is p
  • Swiss roundabout goes underground
    February 7, 2012
    The Swiss, well-known for their tunnel constructions, have enhanced their reputation with the recent Gotthard Tunnel breakthrough which has created the world's longest tunnel. And in Bern, a roundabout is being re-positioned almost 10m under the ground, which will transform a somewhat dismal road intersection into an attractive gateway to the country's capital. PERI provided a comprehensive formwork solution for the realisation of the massive beams, reinforced concrete slab along with the conically-sh
  • Peri delivers formwork for Fehmarnbelt Tunnel
    July 12, 2023
    The last of the 12 ships delivering Peri’s formwork recently arrived at the tunnel element factory east of Rødbyhavn on Denmark’s Lolland island.